Match the complete marking
Compare TC513 3BSE006385R1 with the installed label and the applicable ABB documentation.
-
Check the offered item before ordering
Request photos of the offered TC513 3BSE006385R1. Have the maintenance team compare the marking, interfaces and included items with the installed unit and applicable ABB documentation.
Technical specifications for TC513 3BSE006385R1
-
Manufacturer:ABB
-
Product Category:General Automation
-
Spare Part Number:TC513 3BSE006385R1
-
Weight:0.7 kg
-
Tariff Code:8537101190
-
Equipment role:AF100 Twisted-Pair/Coax Converter Modem
-
System context:ABB Advant Fieldbus 100 communication system
-
Article number:3BSE006385R1
-
Module designation:TC513
-
Network role:AF100 twisted-pair/coax conversion
-
Bus media:Twisted-pair and coaxial cable
-
Power interface:24 V DC at X2
-
X1 and X2 connectors:2-pole jack screw-connectors
-
X3 connector:4-pole jack screw-connector
-
X4 coax connector:DIN 9-pole connector
-
Replacement boundary:Verify cable media, connectors and network position before substitution
Information
- TC513 3BSE006385R1 occupies a defined af100 twisted-pair/coax converter modem position in the ABB Advant Fieldbus 100 communication system; selection depends on the complete marking and the installed interface arrangement.
Change sequence: Restore and validate one side of the conversion path at a time.
Acceptance evidence: Confirm stable end-to-end communication after recommissioning.
Within the ABB Advant Fieldbus 100 communication system, this item must be evaluated together with its carrier, terminals, cables and project configuration. Preserve the as-found interface map and revision information; a mechanically similar item is not automatically an electrical or software equivalent.
Commissioning should progress from identity and connection checks to controlled power-up, diagnostics and a functional proof. Keep the final status, test conditions and remaining exceptions in the maintenance record so later troubleshooting has an accurate baseline.
-
TC513 3BSE006385R1 Technical Reference
Apter Power technical reference - PDF, 3 pages. Exact-model identity, verified parameters, integration logic and engineering questions. -
TC513 3BSE006385R1 Installation & Commissioning Guide
Apter Power engineering guide - PDF, 2 pages. Replacement sequence, commissioning checks, diagnostics and acceptance evidence.
Compatibility boundary: Match the complete marking, hardware execution and installed interfaces before replacement.
-
Installed-system replacement
Compare the exact order code, host position and connected interfaces with the removed item. -
Planned maintenance
Capture the as-found label, status and configuration before disturbing the installation. -
Controlled commissioning
Restore documented connections and prove the intended signal, communication or control response. -
Spare qualification
Keep revision, configuration and acceptance evidence with the spare-part record.
Check every token in TC513 3BSE006385R1 against the offered label and approved record.
Follow the site procedure for stored energy, field power and electrostatic handling.
Photograph and label the carrier, terminals, cables and keying before removal.
Archive the applicable ABB Advant Fieldbus 100 communication system project or hardware settings before replacement.
Check connectors, terminal blocks, carriers and cable condition before blaming the module.
Use an approved functional test and retain the as-left diagnostic and acceptance evidence.
Alternative Names
Technical notes
Evidence scope: The complete ABB article number identifies the AF100 converter modem; site network topology and media execution remain installation-specific.
Installation boundary: The exact installed carrier, terminals, cables and project configuration remain site-specific.
Technical reference: ABB parts identity for TC513 3BSE006385R1 and AF100 system documentation
FAQ View All FAQ
-
How should TC513 3BSE006385R1 be identified before a replacement is approved?Compare every token in the complete marking, the installed position and the documented af100 twisted-pair/coax converter modem role. Confirm the TC513 3BSE006385R1 marking and the installed ABB Advant Fieldbus 100 communication system position.
-
What installed-system evidence should be retained before removing TC513 3BSE006385R1?Record the slot or mounting position, connected interfaces, status indications and the current ABB Advant Fieldbus 100 communication system configuration. Photograph the complete label before disconnecting anything.
-
How should the interfaces for TC513 3BSE006385R1 be checked during installation?Map each connected interface to the as-found record and the applicable manufacturer documentation. Keep connector, keying and terminal assignments consistent with the as-found record.
-
What configuration boundary matters when commissioning TC513 3BSE006385R1?Use the approved ABB Advant Fieldbus 100 communication system project and the exact hardware or assembly revision. Do not treat physical fit as proof that the stored configuration and interface assignment are correct.
-
How can a suspected TC513 3BSE006385R1 fault be separated from field wiring or carrier faults?Check supply and reference conditions first, then inspect the carrier, connectors and external wiring. Move to a controlled substitution only after the upstream and downstream paths have been documented.
-
What should be verified after fitting TC513 3BSE006385R1 to the installed system?Confirm normal status indications, communication or signal continuity and the intended control response under an approved test state. Record the as-left state and compare it with the approved acceptance baseline.
-
Can TC513 3BSE006385R1 be replaced by a similar-looking assembly?No direct equivalence is established by appearance. Compare the complete order code, revision, interface execution and system configuration before approving an alternative.
-
What handover record is appropriate after work on TC513 3BSE006385R1?Retain the offered and removed markings, connection photographs, configuration record, diagnostic observations, functional test result and any unresolved exception.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
TC513 3BSE006385R1Product Details -
CP-A RU 1SVR427071R0000Product Details -
3BHE036290R0005 GDC806 B05Product Details -
GJR5143600R0001-35TP90Product Details -
DO801 3BSE020510R1Product Details -
1KHL178025R0102P-COM02Product Details -
3BHE027867R0101Product Details -
APOW-01CProduct Details -
DFC02 DFC-02Product Details -
AFPS-11CProduct Details
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.