Part Verification

Bently Nevada 3500/22M: Check the TDI and I/O Scope

A 3500/22M quotation needs to distinguish the 288055-01 TDI spare from the 146031-01 Ethernet I/O module. Establish whether the maintenance task needs one component or both before comparing offers.
  • Manufacturer
    Bently Nevada
  • Product family
    3500/22M TDI
  • TDI spare
    288055-01
  • Ethernet I/O
    146031-01
  • I/O interface
    10Base-T / 100Base-TX
  • 01

    Separate the references

    288055-01 identifies the standard TDI spare with USB cable; 146031-01 identifies the Ethernet I/O module.
  • 02

    Check the installed arrangement

    Review the rack and I/O arrangement with the responsible engineer before accepting a supply scope.
  • 03

    Plan a complete delivery

    If both components are needed, track availability and release conditions for each line.
Illustrative scene: Bently Nevada monitoring modules

Why the Supply Scope Matters

The family name 3500/22M is useful for starting an enquiry, but it does not replace a complete parts list. A quotation for the TDI alone may leave a required I/O component outside the order. Begin with the installed equipment and the maintenance task: what is being replaced, what will remain in service, and which items must arrive together?

288055-01 and 146031-01: Two Distinct Components

The 3500/22M is a Transient Data Interface. Bently Nevada lists 288055-01 as the standard TDI spare with USB cable and 146031-01 as the 10Base-T/100Base-TX I/O module. They are distinct components, not interchangeable names for the same item. Confirm the required hardware and software context before approving the offer.
  • TDI reference
    Record 3500/22M and 288055-01 where the standard TDI spare is required.
  • I/O reference
    List 146031-01 separately when that Ethernet I/O module is part of the requirement.
  • Supply boundaries
    Specify required accessories, offered condition, relevant revision information and any components excluded from the offer.

Build a Checkable Supply Request

  • 01 / Installed system

    Record the existing arrangement

    Collect readable labels and photographs of the front module, rear I/O and rack arrangement. State the maintenance task.
  • 02 / Scope

    Identify what must be supplied

    Ask the engineer to distinguish the replacement TDI, any required I/O and accessories from items that will remain installed.
  • 03 / Offer

    Separate the quotation lines

    Request a full reference and quantity for each required component. Do not accept an assembly description that leaves its contents unclear.
  • 04 / Review

    Compare the offered components

    Check actual-unit identification, condition and relevant revision information against the approved scope. Resolve differences before release.
  • 05 / Timing

    Confirm each line's release conditions

    Ask for availability and estimated dispatch for each item. Decide whether split delivery is useful if both components are needed for the task.
  • 06 / Receipt

    Reconcile the complete requirement

    Match received items to the agreed list and retain their identification. Route a missing component or discrepancy to the named order contact.

A Complete Quotation for the Required Components

The quotation should name every required component and its inclusions. Review availability for each line, then compare the received items against the approved list so a missing I/O module or accessory does not leave the task incomplete.
A complete reference is only useful when the supply scope is complete too.
Use a line-by-line requirement, an approved offer and a receiving comparison to confirm the outcome.

Three decisions before purchase

  • Sales enquiry
    Correct parts
    Am I buying the complete requirement?
    Keep 288055-01 and 146031-01 as distinct lines when both are needed. Have the engineer approve the scope and any relevant hardware or software constraints.
  • Technical review
    Delivery planning
    Will everything needed arrive in time?
    Review availability and dispatch conditions for every required line. A ready TDI does not establish that its required I/O is ready as well.
  • Delivery planning
    Responsibility
    Who resolves an incomplete supply?
    Name an order contact and agree how omitted items, identification differences and shipping exceptions will be reported and reviewed.

Records to Keep

  • Installed labels
    Readable references for the existing TDI and I/O.
  • Approved scope
    The items to replace, retain and order.
  • Offer identification
    Photographs and details for the actual units offered.
  • Quotation
    Separate references, condition, inclusions and release conditions.
  • Delivery record
    Dispatch and tracking information for each released line.
  • Receiving comparison
    A check of the received items against the approved requirement.
Treat 288055-01 and 146031-01 as separate components; do not assume a quotation includes both.

Clarify your 3500/22M requirement

Send the installed labels, required references and quantities, plus your destination and required arrival date. Tell us whether you need the TDI, I/O or both.

Related reading

See accounts and guides
EMAIL UPDATES

Receive lifecycle and catalogue updates

Sign up for occasional notes on component lifecycle changes, catalogue additions and purchasing guidance.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.