Match the complete marking
Compare 1KHL178025R0102P-COM02 with the installed label and applicable ABB documentation.
-
Check the offered item before ordering
Request photos of the offered 1KHL178025R0102P-COM02 and compare markings, interfaces and included items with the installed unit.
Technical specifications for 1KHL178025R0102P-COM02
-
Manufacturer:ABB
-
Product Category:General Automation
-
Spare Part Number:1KHL178025R0102P-COM02
-
Weight:0.4 kg
-
Tariff Code:8537101190
-
Equipment role:Industrial Communication Board
-
System context:ABB installed control platform
-
Verification boundary:Match board artwork, connectors and host position
Information
- 1KHL178025R0102P-COM02 occupies a defined service position in the ABB installed control platform; selection depends on the complete marking and installed boundary.
Installed position: Preserve connector orientation, cable map and host position before removal.
Revision boundary: Similar appearance does not establish interface or revision equivalence.
Within the ABB installed control platform, evaluate this item together with its carrier, terminals, cables and project or hardware settings. Preserve the as-found interface map and revision evidence; a mechanically similar item is not automatically equivalent.
Commissioning should progress from identity and connection checks to controlled power-up, diagnostics and functional proof. Keep the final status, test conditions and open exceptions in the handover record.
-
1KHL178025R0102P-COM02 Technical Reference
Apter Power technical reference - PDF, 3 pages. Exact identity, verified evidence, engineering decisions and handover records. -
1KHL178025R0102P-COM02 Installation & Commissioning Guide
Apter Power engineering guide - PDF, 5 pages. Replacement sequence, commissioning checks, diagnostics and acceptance evidence.
Compatibility boundary: Match the complete marking, hardware execution and installed interfaces before replacement.
-
Installed-system replacement
Compare the exact code, host position and connected interfaces with the removed item. -
Planned maintenance
Capture the as-found label, status and configuration before disturbing the installation. -
Controlled commissioning
Restore documented connections and prove the intended signal, communication or control response. -
Spare qualification
Keep revision, configuration and acceptance evidence with the spare-part record.
Check every token in 1KHL178025R0102P-COM02 against the offered label and approved record.
Follow the site procedure for stored energy, field power and electrostatic handling.
Photograph and label carriers, terminals, cables and keying before removal.
Archive applicable ABB installed control platform settings before replacement.
Check connectors, terminal blocks, carriers and cable condition before blaming the module.
Use an approved functional test and retain as-left diagnostic and acceptance evidence.
Alternative Names
Technical notes
Pre-purchase checks: Match the offered 1KHL178025R0102P-COM02 nameplate, board artwork, connector arrangement and revision markings with the installed unit and approved ABB system records. Public exact-suffix evidence is limited, so the full code must remain intact.
Board and host pairing: Verify the installed host position, mating connectors and project or hardware configuration before replacement. A board with similar artwork or a shortened base code is not automatically equivalent or included with the supply.
Quotation confirmation: Confirm available quantity, estimated dispatch date, lead-time starting event, included items and documents in writing. Country of origin: Sweden. Condition: New, original product. Supply scope: Confirmed in quotation.
FAQ View All FAQ
-
How should 1KHL178025R0102P-COM02 be identified before a replacement is approved?Compare every token in the complete marking, installed position and documented industrial communication board role. Confirm the physical label before approval.
-
What evidence should be retained before removing 1KHL178025R0102P-COM02?Record the mounting position, connected interfaces, status indications and current ABB installed control platform configuration. Photograph the complete label before disconnection.
-
How should the interfaces for 1KHL178025R0102P-COM02 be checked during installation?Map each connector, terminal and cable to the as-found record and applicable manufacturer documentation. Preserve keying and shielding arrangements.
-
What configuration boundary matters when commissioning 1KHL178025R0102P-COM02?Use the approved ABB installed control platform record and exact hardware execution. Physical fit alone does not prove configuration or interface equivalence.
-
How can a suspected 1KHL178025R0102P-COM02 fault be separated from wiring or carrier faults?Verify supply and reference conditions, then inspect mating hardware and external wiring. Use controlled substitution only after both signal paths are documented.
-
What should be verified after fitting 1KHL178025R0102P-COM02?Confirm normal indications, communication or signal continuity and the intended controlled-system response under an approved test state.
-
Can 1KHL178025R0102P-COM02 be replaced by a similar-looking assembly?No direct equivalence is established by appearance. Compare the complete code, revision, interface execution and installed configuration.
-
What handover record is appropriate after work on 1KHL178025R0102P-COM02?Retain offered and removed markings, connection photographs, configuration evidence, diagnostics, functional-test results and unresolved exceptions.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.