Speak to a sourcing specialist
sales13@apterpower.com
Get a quick price for CC-MCAR01
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for CC-MCAR01

  • Manufacturer:
    Honeywell
  • Product Category:
    DCS Systems
  • Spare Part Number:
    51403884-100
  • Estimated shipping dimensions:
    40.5x14.5x3.3cm
  • Weight:
    0.66 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    USA
  • Carrier length:
    3 ft; 1 m
  • Mounting orientation:
    Vertical
  • Power bus:
    24 Vdc
  • Included buses:
    Common bus; shield landing bus
  • Assembly type:
    Carrier channel

Information

Overview Manuals Common Applications Product Precautions
Honeywell CC-MCAR01 is a 3-foot vertical carrier-channel assembly that supports Series C hardware and distributes its 24 Vdc, common and shield buses.
  • Supports Series C carriers vertically
  • Distributes the 24 Vdc carrier bus
  • Provides common-bus continuity
  • Provides shield landing points

CC-MCAR01 operates with Series C carriers, 24 Vdc cabinet feed, Common bus jumpers, Shield landing hardware.

Its engineered use includes Vertical Series C cabinets, High-density I/O marshalling, Controller and I/O carrier rows, Process-control cabinet expansion.

Important Notice: Confirm the complete CC-MCAR01 marking, installed-system configuration, field connections and controlled functional test before commissioning or replacement.

Apter Power CC-MCAR01 Manuals and Guides
Apter Power CC-MCAR01 Product Technical Reference PDFApter Power CC-MCAR01 Installation and Verification PDF
The first document is an Apter Power model-specific technical reference. The second supports installation, configuration and engineering verification for CC-MCAR01.
Vertical Series C cabinetsSupports Series C carriers vertically
High-density I/O marshallingDistributes the 24 Vdc carrier bus
Controller and I/O carrier rowsProvides common-bus continuity
Process-control cabinet expansionProvides shield landing points
Read the applicable Honeywell instructions before work. Verify CC-MCAR01 and the installed Experion Series C configuration.
1Verify the complete CC-MCAR01 marking and its assigned Experion Series C position before work.
2Isolate the applicable power and field energy before disconnecting CC-MCAR01.
3Protect CC-MCAR01 connectors and electronic assemblies with approved ESD controls.
4Record the installed wiring, channel assignment and configuration before replacement.
5Match Series C carriers and 24 Vdc cabinet feed to the documented system arrangement.
6Commission CC-MCAR01 with controlled status, signal and diagnostic checks.
7Retain the final vertical series c cabinets functional-test result in the maintenance record.

Technical notes

Bond the channel to the cabinet, verify bus polarity and continuity, and maintain the documented carrier spacing before mounting modules.

FAQ View All FAQ

  • Does CC-MCAR01 match Series C carriers in a Vertical Series C cabinets installation?
    Verify the complete CC-MCAR01 marking, the documented Experion Series C position and the installed Series C carriers before fitting the assembly.
  • How should CC-MCAR01 be wired when it must supports series c carriers vertically?
    Isolate the circuit, identify every terminal and reproduce the approved polarity, shield and channel assignment for CC-MCAR01; then continuity-test the affected path.
  • Which Experion Series C records should be captured before removing CC-MCAR01?
    Record the as-found wiring, installed position, active configuration and diagnostic state associated with CC-MCAR01 before disconnection.
  • What controlled test confirms that CC-MCAR01 can distributes the 24 vdc carrier bus?
    Apply the approved field or simulated stimulus, observe the Experion Series C indication and confirm the intended response without bypassing the normal interlocks.
  • Which 24 Vdc cabinet feed condition should be checked when CC-MCAR01 reports an abnormal state?
    Check the 24 Vdc cabinet feed supply, seating and connection first, then compare channel diagnostics with the recorded CC-MCAR01 baseline.
  • Can CC-MCAR01 be moved directly into High-density I/O marshalling without validating Shield landing hardware?
    No. Confirm the Shield landing hardware, revision, connection scheme and Experion Series C configuration before transferring CC-MCAR01 to that duty.
  • What maintenance evidence is required after CC-MCAR01 is used for Controller and I/O carrier rows?
    Retain the nameplate record, corrective action, final diagnostics and a controlled controller and i/o carrier rows functional-test result for CC-MCAR01.
  • How should CC-MCAR01 be returned to service in Process-control cabinet expansion?
    Restore power under control, verify provides common-bus continuity, exercise the intended signal path and release CC-MCAR01 only after the Experion Series C remains in its approved operating state.
Related reading

Related cases and sourcing guidance

View all case studies
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.