Bently
View products
Select the contact circuit from the approved cause-and-effect and loop drawings, then keep the external load source separate from the module-input supply during testing.
Acceptance should prove the commanded relay state, contact transition, connected-load response and final safe condition without exceeding the stated contact boundary.
Important Notice: Confirm whether the connected circuit uses the documented DC or AC contact rating before conductors are transferred.
The Technical Reference records module-input, relay-contact and environmental limits. The Installation & Commissioning Guide focuses on power isolation, external load wiring and SIS proof-test acceptance.


















