Verify the complete Westinghouse 1P00028G01 marking, installed revision, connectors and system position before replacement. Confirm every retained value against the nameplate and controlled installation record before commissioning.
Important Notice: Confirm the complete Westinghouse 1P00028G01 identity and controlled configuration before commissioning.
The first document presents model-specific technical and system data. The second provides a separate installation, connection, commissioning and acceptance workflow.