Back up the MP920 application, communication settings and memory records before replacement. Confirm the JEPMC-CP200 marking, rack position, battery condition and serial-port assignments, then verify controller status and communications before release.
Important Notice: Verify JEPMC-CP200 from the physical marking and current manufacturer documentation before installation or configuration.
The first document presents model-specific technical and system data. The second provides a distinct installation, connection, commissioning and acceptance workflow.