-
Match the complete marking
Provide the complete DS200TCPSG1AME label, installed-position photographs and connected-component identities.
-
Check the offered item before ordering
Compare the offered DS200TCPSG1AME hardware, interfaces and included items with the approved drawing.
Technical specifications for DS200TCPSG1AME
-
Manufacturer:General Electric
-
Product Category:Gas Turbine Control
-
Spare Part Number:DS200TCPSG1AME
-
Weight:1.22 kg
-
Tariff Code:8537101190
-
Product type:Power Supply Board
-
Product family:DS200 / Mark V
-
Functional acronym:TCPS
-
Input supply:125 V DC from TCPD power distribution
-
Installed location:R, S, T and C Mark V cores
-
2PL connector:Daisy-chain board supply distribution
-
J1 connector:125 V DC input from TCPD
-
JC connector:Power-supply diagnostic distribution
-
X1 connector:CCOM bus connection
-
Configuration:No hardware jumper or software configuration
Information
- DS200TCPSG1AME is the complete offered reference for a power supply board in Mark V Speedtronic I/O-core power distribution.
Identity-led replacement: The complete DS200TCPSG1AME marking keeps revision, interface and fitted-position decisions tied to the actual unit.
Controlled return to service: Connector, terminal, setting and diagnostic evidence are checked before the affected function is released.
The verified technical rows distinguish exact-model identity from family-level system context. Dimensions and weight are shipping estimates supplied for this offered item; technical acceptance follows the installed drawing and manufacturer evidence.
Before exchange, record the fitted position, every connector or terminal identity, adjustable settings and the healthy operating baseline. After installation, prove the affected function under a controlled site procedure.
DS200TCPSG1AME Manufacturer Technical Excerpt
GEH-6153 Mark V hardware description. Selected pages retain the applicable technical context without third-party advertising.DS200TCPSG1AME Installation & Verification Guide
Model-specific identity capture, controlled exchange, fault-isolation, commissioning and handover checks.
Application scope: Use DS200TCPSG1AME only where the complete marking, hardware execution and installed interface match the approved design.
Exact-model service replacement
Replace the same DS200TCPSG1AME execution after documenting the installed interface.System maintenance
Retain the Mark V Speedtronic I/O-core power distribution relationship and approved drawing references.Controlled fault isolation
Separate board, wiring, power and companion-hardware causes before substitution.Commissioning evidence
Capture diagnostics and a functional test of the affected power supply board path.
Photograph DS200TCPSG1AME and all secondary labels before removal.
Record jumpers, switches, firmware, ranges or calibration references that apply.
Follow the approved isolation and electrostatic handling procedure.
Mark conductors, plugs, fibers or tubing by their installed identifiers.
Check contacts, terminals, guides, supports and protective earth.
Verify diagnostics and actual process or equipment response before handover.
Alternative Names
Technical notes
Evidence boundary: GEH-6153 Mark V hardware description
Exact-model rule: Do not infer interchangeability from a similar family code; match DS200TCPSG1AME completely.
Acceptance record: Retain identity, interface, settings, diagnostics and functional proof.
FAQ View All FAQ
-
Which installed identity details must be recorded for DS200TCPSG1AME?Record the full label, fitted position, connector or terminal map, and every adjustable setting before removal.
-
What interface check is most important before replacing DS200TCPSG1AME?Compare the receiving hardware and every keyed, numbered or polarized connection with the approved drawing.
-
How should settings be controlled when servicing DS200TCPSG1AME?Photograph and transcribe jumpers, switches, firmware or range selections that apply to this exact execution.
-
What should be inspected before fitting DS200TCPSG1AME?Inspect contacts, terminal hardware, board supports, protective earth and nearby wiring for damage or contamination.
-
Which companion hardware must be verified with DS200TCPSG1AME?Confirm the associated controller, terminal board, rack, power source or field device named by the installed design.
-
How should energization be managed after installing DS200TCPSG1AME?Restore energy in the approved sequence, watch diagnostics, and stop if the expected healthy state is not obtained.
-
What functional proof adds technical value for DS200TCPSG1AME?Exercise the affected signal, protection, power or communications path and retain before-and-after readings.
-
What handover record is required after commissioning DS200TCPSG1AME?Keep the exact part marking, installed photographs, settings, test results, deviations and responsible approval.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
DS200TCPSG1AMEProduct Details -
IS200STTCH2AProduct Details -
531X123PCHACG1Product Details -
IS220STAOH2AProduct Details -
IS200TBAIH1CDDProduct Details -
531X303MCPBCG1Product Details -
8121-DI-DC-01Product Details -
DS200SLCCG1AFGProduct Details -
8617-FT-NIProduct Details -
DS200SLCCG1ACCProduct Details
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.




