The cable is routed between the machine-mounted sensing device and the monitored-system terminal interface. Installation preserves the connector, terminal-lug identification, shield path and armor while keeping the approved sensor and channel configuration unchanged.
Important Notice: Confirm 16710-12, the compatible sensing device and monitor channel, twelve-foot routing requirement, three-socket connector, terminal-lug assignments, shield and armor condition, grounding plan, channel configuration and controlled continuity and response-test results before commissioning.
Apter Power 16710-12 Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.