Install only after the medium-voltage drive is isolated and the stored energy is proven discharged. Preserve the installed device position, cooling arrangement, gate connections and mechanical clamping record, then complete the manufacturer commissioning sequence before motor operation.
Important Notice: Confirm Allen-Bradley 81001-451-61-R, the complete PowerFlex 7000 or MV SMC Flex host identity, installed hardware execution, board or semiconductor position, connectors, wiring, grounding, cooling path, firmware or configuration where applicable, companion components and controlled commissioning results before service.
Apter Power Bently Nevada 81001-451-61-R Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct installation, connection and commissioning workbook with field checks and acceptance records.