Record the complete PE1364B identity, firmware, fiber type, node arrangement, IP settings and Modbus register map before replacement or recommissioning.
Important Notice: Confirm the complete ABB PE1364B identity and controlled configuration before commissioning.
The first document presents model-specific technical and system data. The second provides a separate installation, connection, commissioning and acceptance workflow.