ABB 3BHE004573R0042 UFC760-BE42 is the ABB INT, UF C760 BE42 main-circuit interface spare part for INU equipment.
- Official product name: MAIN CIRC. INTER.
- ABB technical information: FOR INU
- Net weight 0.41 kg; gross weight 0.451 kg
- Replacement Product ID: 3BHE004573R0142
The assembly performs the designated interface function within the main circuit of the applicable INU configuration. ABB's public record does not publish the processed signals, connector allocation, electrical ratings or exact INU models. ABB has announced non-availability for this PCBA and directs modernization enquiries to SRU MVD Sales; the replacement Product ID must be treated as a separate product rather than an identical revision.
Important Notice: Host-system cables, connectors, manuals, replacement assemblies and other accessories are not included unless specifically stated in the quotation or stock description.
Apter Power 3BHE004573R0042 UFC760-BE42 Manuals and Guides
Important Notice: These are two separate Apter Power documents independently prepared from manufacturer-published ABB information. Confirm the physical nameplate, current ABB documents, and host-system requirements before configuration or installation. They do not replace official ABB manuals.
INU Main-Circuit Interface
Performs the designated interface function in the ABB INU configuration identified by the complete Product ID.
Exact-Revision Service
Used only where installed-equipment documentation explicitly calls for 3BHE004573R0042.
Modernization Planning
Supports traceable planning after ABB announced non-availability and identified 3BHE004573R0142.
Host-Document Verification
Signal, connector and voltage information is taken from the applicable INU drawings because ABB does not publish it publicly.
Use the complete ABB identity and the current host-system documentation before installation, replacement or commissioning.
1Do not merge R0042 with R0041, R0043, R0142, R1042 or R1142.
2Record connector positions and cable labels before removing the installed assembly.
3Use the host INU documentation for signals, voltages and connector allocation.
4Treat 3BHE004573R0142 as a separate modernization product, not an identical revision.
5Follow the host equipment isolation, discharge and ESD procedures before handling the PCBA.