The panel provides operator visualization for its configured automation project. Replacement work preserves the project backup, interface wiring, supply arrangement and panel cutout before commissioning.
Important Notice: Verify the complete 6AV3627-1QL00-0AX0 marking, installed project, interfaces and supply before powering a replacement panel.
The technical reference consolidates exact product data and service boundaries. The installation guide organizes controlled replacement, wiring checks, commissioning and acceptance.