The controller is used with the installed 984 housing, power supply, 800-series I/O interfaces and the approved Modbus Plus or S908 network arrangement. Commissioning requires a matched project backup, node settings, I/O map, battery condition and full application diagnostics.
Important Notice: Confirm PC-E984-685, 984 housing and power supply, hardware revision, Modsoft project, battery, Modbus Plus node, S908 interface when fitted, 800-series local and remote I/O map, field wiring, grounding and controlled functional-test results before commissioning.
Apter Power PC-E984-685 Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.