The 330878-X0-00 MOD:177889-01 is supplied as a Bently Nevada 3300 XL 50 mm Proximitor Sensor marking. Official Datasheet 174014 identifies 330878 as the Proximitor Sensor family; the X0 length/mounting field and MOD 177889-01 are nonstandard details that require the applicable modification drawing.
- 3300 XL 50 mm Proximitor Sensor
- 5.0 m or 9.0 m
- Panel mount or 35 mm DIN mount
- 27.9 mm (1100 mil)
The Proximitor Sensor powers a matched 3300 XL 50 mm probe circuit, conditions the returned eddy-current signal, and produces a voltage proportional to the gap between the probe tip and a conductive target. The large linear range supports turbine differential expansion and other large-displacement measurements.
Important Notice: Keep the supplied complete marking unchanged and verify nonstandard, placeholder, legacy, or MOD-controlled fields against the physical nameplate and current official documentation.
Apter Power 330878-X0-00 MOD:177889-01 Manuals and Guides
Important Notice: These are two separate Apter Power documents prepared from the official Bently Nevada source named in each document. Confirm the physical nameplate, current manufacturer documentation, and applicable installation or modification drawing before installation or replacement.
Large Steam Turbines
Conditions differential-expansion measurements
Axial Position Monitoring
Measures large target displacement within the matched linear range
Turbine Commissioning
Provides a conditioned voltage for gap and movement checks
MOD-Controlled Installations
Supports documented site-specific configurations when the MOD drawing is available
Read and follow the official manufacturer source and applicable installation instructions before use. Verify the exact complete ordering code from the physical nameplate.
1
Do not assign 5 m, 9 m, panel, or DIN meaning to X0 without the MOD drawing
2
Match probe plus extension-cable length to the sensor calibration
3
Verify target material and maintain the published minimum target size
4
Observe wiring, grounding, approval, and enclosure requirements
5
Record the MOD drawing revision during commissioning