-
Match the complete marking
Match the complete Siemens 6GK1105-2AB10 marking and installed configuration. Compare the 2AB10 marking, six RJ45 ports, optical connections and digital-input terminal blocks.
-
Check the offered item before ordering
Request available label and connector photos. Have your maintenance team compare the offered 6GK1105-2AB10 with the installed equipment and applicable Siemens documents.
Technical specifications for 6GK1105-2AB10
-
Manufacturer:Siemens
-
Product Category:PLC Systems
-
Spare Part Number:6GK1105-2AB10
-
Weight:1.6 kg
-
Tariff Code:8537101190
-
Copper ports:6 × 10/100 Mbit/s RJ45
-
Optical ports:2 × 100 Mbit/s full-duplex BFOC
-
Digital inputs:8 × 24 V DC
-
Supply inputs:2 decoupled 24 V DC sources; 18–32 V DC
-
Input state 1:+13 to +30 V
-
Input state 0:−30 to +3 V
-
Digital-input current:8 mA maximum
-
Signaling contact:24 V DC / 100 mA maximum
-
Learnable addresses:Up to 7000
-
Aging time:40 s default
Information
- Siemens 6GK1105-2AB10 separates local copper device connections from the optical network backbone. Its ring and standby functions provide engineered redundancy while digital-input indications help supervise cabinet conditions.
Availability: Ring manager and standby-coupling functions
Supervision: Local input indication and signaling contact
A redundant OSM/ESM ring requires exactly one redundancy manager. The sub-0.3-second reconfiguration condition applies to an OSM/ESM-only ring within its supported node limit. Mixing unrelated switches into that ring changes the assumptions and must be engineered separately.
The eight digital inputs belong to monitoring and management, not a safety input system. Redundant supply connections and the signaling contact should be tested independently from the data links. Preserve input polarity and configured fault reporting so a healthy Ethernet link cannot mask a missing supply or cabinet alarm.
6GK1105-2AB10 Original Technical Excerpt
Siemens Industrial Ethernet OSM/ESM Manual, C79000-Z8976-C068-10. Selected original pages retain the relevant technical context. PDF · 10 pages.6GK1105-2AB10 Installation & Verification Guide
Apter Power installation workbook covering map the active topology, check power and grounding, reconnect copper and fiber, validation and handover. PDF · 5 pages.
Application scope: These applications describe the intended system function. Select the actual configuration for that function; accessories are included only when itemized.
Optical plant backbone
Join local Ethernet devices to an engineered multimode backbone.OSM/ESM redundant ring
Maintain an alternate network path with a single selected redundancy manager.Cabinet-state monitoring
Bring non-safety DC status signals into switch supervision.Redundant segment coupling
Use a supported standby pair and synchronization connection between engineered segments.
Record port assignments, optical direction, ring-manager selection and standby coupling. Save management settings and input alarm assignments. Identify which paths can be isolated without defeating the required network availability.
Isolate the work area as required and compare both supply circuits with the approved SELV arrangement. Inspect the signaling-contact wiring separately from the power feed. Retain cabinet grounding and horizontal ventilation orientation.
Restore RJ45 branches and the BFOC optical pairs to their labeled ports. Inspect connector condition and verify the fiber type and budget; protect optical ends from contamination. Confirm display mode before interpreting front indications.
Within an approved network test window, interrupt one intended redundant path and observe recovery. Test each power feed and representative digital-input alarm independently. A link remaining up is not sufficient proof that supervision operates.
Restore the normal topology, confirm a single redundancy manager and review persistent faults. Retain the final settings, observed recovery behavior and port map. Remove temporary test connections before releasing the network.
Retain the final tested settings, physical connections and accepted operating response for 6GK1105-2AB10.
Alternative Names
Technical notes
Ring closure: Close a redundant path only after confirming the manager assignment and supported topology. An unmanaged loop can disrupt the network.
Input interpretation: Input-status mode changes the meaning of front indicators; distinguish electrical signal state from port-link state.
Fiber assessment: Evaluate the complete optical path including connectors and splices. Maximum distance is conditional on the specified fiber and attenuation margin.
FAQ View All FAQ
-
What happens if two devices share ring-manager duty with 6GK1105-2AB10?The topology violates the single-manager ring arrangement. Establish exactly one manager and verify the ring state before closing the redundant path.
-
Why can 6GK1105-2AB10 show a healthy copper link while an optical backbone path fails?Copper access ports and optical backbone ports are separate links. Inspect the optical pair, fiber polarity and loss budget in addition to the local device connection.
-
Can the 26 km optical figure be applied to 6GK1105-2AB10?No. That figure belongs to the long-distance ITP62-LD. TP62 uses the specified multimode link budget and corresponding maximum span.
-
How should redundant power on 6GK1105-2AB10 be verified?Test each supply path separately under the approved maintenance procedure and confirm both continued communication and the configured fault indication.
-
Does a monitored digital input on 6GK1105-2AB10 create a safety function?No. These inputs provide monitoring information. Any safety-related function needs its own assessed safety architecture.
-
Why can an unfamiliar switch invalidate the recovery expectation for 6GK1105-2AB10?The stated recovery condition assumes an OSM/ESM ring. A mixed topology may use different loop-control and recovery behavior.
-
How can input-status display selection affect troubleshooting on 6GK1105-2AB10?The LEDs can represent different display modes. Confirm the selected mode before interpreting a lamp as an Ethernet port or digital-input state.
-
What should be checked after changing a fiber patch cord on 6GK1105-2AB10?Verify transmit/receive pairing, connector cleanliness, link indication and the complete optical loss budget, then test the required ring recovery.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.








