The assembly must remain matched to the installed FBM24B or FBM25B position and the site wiring drawing. The page intentionally avoids unsupported electrical ratings where no exact current public manufacturer data sheet is available.
Important Notice: Confirm P0902BP, the installed FBM24B/FBM25B position, both connector ends, cable orientation, field-terminal drawing, conductor map, shielding, grounding, diagnostics and controlled input-test evidence before commissioning.
Apter Power P0902BP Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.