Install FC-UGAI01 only in the documented CC-UGIA0 position and confirm the field, safe-area and 24 V DC connections. Prove loop current, HART communication and open-wire fault transparency before returning the channel to service.
Important Notice: Verify FC-UGAI01 from the physical marking and current manufacturer documentation before installation or configuration.
Important Notice: Use these model-specific records together with the current manufacturer publication and the installed-system documentation.