Speak to a sourcing specialist
sales13@apterpower.com

IS215VPROH1BE

Emergency Turbine Protection Assembly
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

This Mark VI emergency protection execution belongs to the independent VPRO turbine-protection path. H1B supports a second TREG connection at J4, a significant selection difference from the lower-power H2B arrangement that omits that second trip-board path.
  • Manufacturer part number
    IS215VPROH1BE
  • Shipping
    Swift global dispatch
  • Condition
    New, original product
  • Shipping size (est.)
    10cm x 18.6cm x 26.1cm
  • Country of Origin
    USA
Get a quick price for IS215VPROH1BE
E-mail *
Mobile
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 0

    Review your reference

    Send the full marking, quantity and label photos. We review the item and any version details that need clarification.
  • 1

    Confirm the offer

    Check the quoted reference, condition, included items and expected dispatch date before approving your order.
  • 2

    Arrange dispatch

    Confirm delivery details and receive the tracking number when it becomes available.
  • Match the complete marking

    Include IS215VPROH1BE and every hardware or assembly-revision marking visible on the item. Keep the exact reference on your enquiry and quotation.
  • Check the offered item before ordering

    Request available label and interface photos. Have your maintenance team compare the offered IS215VPROH1BE reference with the installed equipment and applicable General Electric documentation.

Technical specifications for IS215VPROH1BE

  • Manufacturer:
    General Electric
  • Product Category:
    Gas Turbine Control
  • Spare Part Number:
    IS215VPROH1BE
  • Weight:
    2.12 kg
  • Tariff Code:
    8537101190
  • Nominal DC supply:
    125 V DC
  • DC input range:
    70-145 V DC
  • Speed inputs per VPRO:
    3
  • Speed input frequency span:
    2 Hz-20 kHz
  • Speed accuracy:
    0.05% of reading
  • Speed resolution at 100 Hz frame rate:
    15 bit
  • Maximum frame rate:
    100 Hz
  • PT inputs per VPRO:
    2
  • Nominal PT input:
    115 V rms
  • Synchronizing frequency span:
    45-66 Hz
  • Thermocouple inputs per VPRO:
    3
  • Parallel-fed analog input channels:
    3
  • Supported TREG connections, H1B:
    2
  • PT circuit burden:
    Less than 3 VA
  • PT isolation barrier:
    1,500 V RMS
  • PT cable allowance:
    100 m, 18 AWG twisted shielded wire

Information

Overview Downloads Applications / Compatibility Product Precautions
  • General Electric IS215VPROH1BE belongs to the independent emergency-protection path, where speed voting, trip-board feedback and separately supplied solenoids must be tested as a complete protection function.
H1B selection: J4 supports the second TREG path omitted from H2B.
Protection separation: VPRO processing and power remain independent of normal VME communication.
Trip proof: Command, relay feedback and solenoid voltage are distinct observations.
IS215VPROH1BE belongs to the Mark VI emergency turbine-protection arrangement. The protection module uses independent VPRO channels with their own processor, power and IONet connection. Its operational protection path is not dependent on ordinary VME backplane communication, which separates it from a general rack I/O board.

The H1B generation supports a second TREG trip board through J4. H2B is a lower-power execution without that second trip-board connection. Before selecting a replacement, reconcile the installed number of TREG boards and trip-solenoid wiring with the exact H1B reference; a reduced connection arrangement is not automatically equivalent.

Each VPRO channel accepts its own speed inputs and participates in the emergency protection logic. Potential-transformer, thermocouple and analog functions have separate interface requirements. Protection acceptance must retain the actual channel voting, trip outputs and approved machine setpoints; a healthy communication link does not prove the emergency trip path.
Controller platform reference: GE Mark VI independent turbine protection. Retain the H1B trip-board arrangement.
System and supply context: The H1B protection design can serve two TREG boards in the Mark VI emergency trip architecture; the exact installed trip arrangement determines the acceptance scope.

Integration boundary: Do not confuse the IS215 assembly reference with a claim that a complete three-channel protection module or all terminal boards are included.
Use the approved protection outage and trip-test plan; software command alone does not prove relay or solenoid action.
Identify dedicated DC feeds

Trace VPRO power and each separately fused trip-solenoid feed before isolating the protection hardware.

Preserve trip-board count

Match J3/J4 cabling and configured solenoid groups to the actual TREG population.

Retain speed scaling

Record tooth count, pickup identity and application/I/O emergency settings before injecting a speed signal.

Keep primary and backup evidence

Test the emergency path without treating the normal controller speed indication as proof of backup protection.

Check PT burden and phase

Use the intended isolated PT interface and its allowed burden; preserve generator/bus assignment for the synchronizing test.

Observe final trip hardware

Record relay contact feedback and solenoid voltage as well as the software trip command under the authorized machine procedure.

Alternative Names

GE IS215VPROH1BE General Electric IS215VPROH1BE

Technical notes

Solenoid-power diagnosis: A missing second-TREG power diagnostic can originate in its 125 V feed/cabling or a configuration requesting a second trip group that is not installed.

Synch-check path: K25A feedback spans the protection and synchronizing interfaces; a command/contact mismatch is not resolved by a speed-input calibration.

Independent sources: Each VPRO has its own onboard supply derived from cabinet DC. A normal VME communication test does not exercise that dedicated supply or the trip-solenoid feed.

FAQ View All FAQ

  • What should be checked when IS215VPROH1BE reports second-TREG solenoid power missing?
    Compare the configured second trip group with the actual J4-connected board, then inspect its DC feeder and cable path. The diagnostic may also arise when a second group is configured without a second TREG.
  • Why can IS215VPROH1BE show a trip relay contact mismatch despite a correct command?
    The diagnostic compares requested state with hardware feedback. Trace the named relay, terminal-board feedback and interconnecting cable; a software command alone does not establish that the contact changed state.
  • How does IS215VPROH1BE distinguish a stale speed signal from a speed-difference condition?
    When their respective functions are enabled, stale-speed logic checks lack of change over five frames, while speed-difference logic checks deviation from the configured comparison over more than three consecutive frames. Preserve the enabled function and signal source before diagnosing either.
  • What does an enabled control-watchdog trip on IS215VPROH1BE require?
    Verify that the configured ContWdog signal changes at least once per frame. The diagnostic detects five unchanged frames and requires the documented recovery condition; a stable Ethernet link alone does not prove application updates.
  • Can the PT burden of IS215VPROH1BE be ignored because it is only a protection input?
    The documented PT circuit has a load below 3 VA and an isolated input arrangement. Include its burden and cable arrangement when validating generator/bus secondary circuits rather than treating it as an unconnected voltage probe.
  • Why must IS215VPROH1BE speed injection retain tooth-count configuration?
    The measured pulse frequency is converted into machine speed using the configured relationship. Prove the intended speed and emergency-trip logic with that relationship, not just that a frequency appears on an input.
  • How are thermocouple and analog input assignments different on IS215VPROH1BE?
    The three thermocouples belong to each VPRO channel, while TPRO feeds the configured analog signals in parallel to the protection channels. Test the intended physical assignment and voting path rather than assuming all inputs are independently wired per board.
  • Can a healthy normal controller establish protection acceptance for IS215VPROH1BE?
    The emergency system has independent processing, supplies and trip interfaces. Retain separate proof of emergency input, voting/logic, relay feedback and final solenoid action under the approved protection test.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.