-
Match the complete marking
Include IS200ECTBG2ADE and every revision or approval marking visible on the item. Keep the exact reference on your enquiry and quotation.
-
Check the offered item before ordering
Request available label and interface photos. Have your maintenance team compare the offered IS200ECTBG2ADE reference with the installed equipment and applicable GE documentation.
Technical specifications for IS200ECTBG2ADE
-
Manufacturer:General Electric
-
Product Category:Gas Turbine Control
-
Spare Part Number:IS200ECTBG2ADE
-
Weight:0.66 kg
-
General-purpose contact inputs:6
-
Dedicated status inputs:2
-
Contact-wetting voltage:70 V DC
-
General-purpose Form C outputs:4
-
Trip contact outputs:2
-
Relay customer supply, nominal:125 V DC
-
Relay customer supply, minimum:24 V DC
-
Resistive breaking current at 28 V DC:2 A
-
Resistive breaking current at 125 V DC:0.5 A
-
Inductive breaking current at 28 V DC:1 A; L/R 0.007 s
-
Inductive breaking current at 125 V DC:0.1 A; L/R 0.007 s
Information
- ECTBG2 is the simplex execution. ECTBG1 fans inputs to three controllers and uses voted relay control; the G1 and G2 wiring architectures must not be treated as the same spare.
Relay observability: Coil current and auxiliary-contact status provide distinct feedback to the controller.
Simplex-specific routing: The G2 board carries the single-controller contact arrangement rather than the G1 redundant fan-out.
The general-purpose Form C outputs are controlled by EMIO. Coil-current and auxiliary-contact feedback are returned to that controller, so relay diagnosis should distinguish the requested command from the contact result. The board also contains two trip-contact outputs for the customer lockout duty.
The relay breaking capability changes with voltage and load type. The published inductive figures include an L/R condition, and inductive-load suppression is provided externally by the customer. Retain that suppression and the customer contact supply when restoring a simplex EX2100 circuit.
IS200ECTBG2ADE Original Technical Reference Excerpt
Selected original manufacturer pages for the applicable interfaces and technical data. PDF · 3 pages · 31.2 KB.IS200ECTBG2ADE Installation & Commissioning Guide
Simplex Generator-Status and Relay Acceptance. Keep the 86G/52G decisions separate from auxiliary contacts, then prove relay behavior using both controller feedback and the external field circuit. PDF · 2 pages · 91.9 KB.
Application scope: Use the board for its documented contact and relay duties. G1 redundant fan-out and voting do not transfer to G2 simply because the ECTB prefix matches.
Generator lockout input
Preserve the 86G open-for-trip logic and test it against the lockout drawing. Treat this dedicated status separately from a freely assigned auxiliary contact.Generator online status
Restore the 52G closed-online relationship at the intended terminals. Confirm that the controller indication follows the actual breaker/status contact.Auxiliary relay outputs
Match the customer supply and connected load to the voltage-specific breaking limits. Retain external suppression where the relay switches an inductive circuit.Simplex EMIO interface
Connect the G2 contact board to its recorded simplex EMIO path. Compare the control architecture before considering a redundant G1 board as a spare.
External relay-contact power remains a separate isolation source.
Check the open-for-trip relationship before returning protection to service.
Confirm the online status source and its closed-online behavior.
Inspect the customer-provided suppression on inductive loads.
Use the breaking limit for the actual supply and L/R condition.
Compare coil command, auxiliary status and the actual switched circuit.
Alternative Names
Technical notes
Group distinction: G2 is simplex; G1 uses three-controller fan-out and voted relay control.
Load interpretation: The inductive break-current values depend on the stated L/R condition.
Trip-state acceptance: Check 86G with its open-for-trip interpretation separately from 52G closed-when-online status; a generic contact continuity result does not verify both plant states.
FAQ View All FAQ
-
Can IS200ECTBG2ADE be exchanged directly for an ECTBG1 redundant board?The group change is not established as a direct interchange. G1 fans inputs to three controllers and uses voted control, whereas G2 is simplex. Compare the rack architecture and cable routing first.
-
What is the consequence of reversing the 86G logic on IS200ECTBG2ADE?The dedicated input is open for trip. Reversing that relationship can misrepresent lockout status; prove the actual contact and controller interpretation before enabling normal operation.
-
Why should the 52G circuit of IS200ECTBG2ADE be checked independently of auxiliary contacts?52G supplies the generator online state and is closed when online. Confirm its terminal identity and physical status source rather than assigning it as a generic auxiliary input.
-
Does IS200ECTBG2ADE eliminate the need for external suppression on inductive loads?No. The published relay characteristics call for customer-provided external suppression. Retain its correct location and compare the actual inductive duty with the voltage-specific break limit.
-
How can a relay command and relay-status discrepancy on IS200ECTBG2ADE be investigated?Check coil-current feedback and auxiliary-contact status separately, then verify the customer supply and switched field circuit. A valid controller command does not prove the external load received power.
-
Can the 28 V DC breaking-current value of IS200ECTBG2ADE be used for a 125 V DC circuit?No. The manufacturer gives different current limits at those voltages and for resistive versus inductive loads. Select the applicable row and preserve the specified L/R condition.
-
Why can an auxiliary-input test pass while generator status remains wrong on IS200ECTBG2ADE?The six general-purpose inputs are distinct from dedicated 86G and 52G duties. Trace the lockout and breaker-status contacts to their assigned terminals, then prove open-for-trip and closed-when-online interpretation at the controller.
-
How should an intermittent inductive-output fault be assessed on IS200ECTBG2ADE?Compare customer supply and contact-side behavior at switching, inspect the external suppression circuit, and check the voltage-specific break current with the stated L/R condition. A steady-state continuity test alone does not represent an inductive interruption.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.



