Provide the complete DS3800NGDD1C1B label, installed-position photographs and connected-component identities.
-
Check the offered item before ordering
Compare the offered DS3800NGDD1C1B hardware, interfaces and included items with the approved drawing.
Technical specifications for DS3800NGDD1C1B
-
Manufacturer:General Electric
-
Product Category:Gas Turbine Control
-
Spare Part Number:DS3800NGDD1C1B
-
Weight:0.3 kg
-
Tariff Code:8537101190
-
Product type:Field Ground Detector Card
-
Product family:DS3800 / Mark IV
-
Functional acronym:NGDD
-
Card function:Field ground detection
-
System family:Mark IV Speedtronic
-
Board potentiometers:2
-
Board transistors:3
-
Board execution:Plug-in printed circuit card
-
Replacement basis:Complete part number and fitted position
-
Revision suffix:D1C1B
Information
- DS3800NGDD1C1B is the complete offered reference for a field ground detector card in Mark IV Speedtronic field-ground monitoring.
Identity-led replacement: The complete DS3800NGDD1C1B marking keeps revision, interface and fitted-position decisions tied to the actual unit.
Controlled return to service: Connector, terminal, setting and diagnostic evidence are checked before the affected function is released.
The verified technical rows distinguish exact-model identity from family-level system context. Dimensions and weight are shipping estimates supplied for this offered item; technical acceptance follows the installed drawing and manufacturer evidence.
Before exchange, record the fitted position, every connector or terminal identity, adjustable settings and the healthy operating baseline. After installation, prove the affected function under a controlled site procedure.
DS3800NGDD1C1B Technical Reference
Product-specific engineering reference covering verified identity, function, interfaces, inspection and acceptance information for DS3800NGDD1C1B.DS3800NGDD1C1B Installation & Verification Guide
Model-specific identity capture, controlled exchange, fault-isolation, commissioning and handover checks.
Application scope: Use DS3800NGDD1C1B only where the complete marking, hardware execution and installed interface match the approved design.
Exact-model service replacement
Replace the same DS3800NGDD1C1B execution after documenting the installed interface.System maintenance
Retain the Mark IV Speedtronic field-ground monitoring relationship and approved drawing references.Controlled fault isolation
Separate board, wiring, power and companion-hardware causes before substitution.Commissioning evidence
Capture diagnostics and a functional test of the affected field ground detector card path.
Photograph DS3800NGDD1C1B and all secondary labels before removal.
Record jumpers, switches, firmware, ranges or calibration references that apply.
Follow the approved isolation and electrostatic handling procedure.
Mark conductors, plugs, fibers or tubing by their installed identifiers.
Check contacts, terminals, guides, supports and protective earth.
Verify diagnostics and actual process or equipment response before handover.
Alternative Names
Technical notes
Evidence boundary: General Electric Mark IV service documentation and complete product marking
Exact-model rule: Do not infer interchangeability from a similar family code; match DS3800NGDD1C1B completely.
Acceptance record: Retain identity, interface, settings, diagnostics and functional proof.
FAQ View All FAQ
-
Which installed identity details must be recorded for DS3800NGDD1C1B?Record the full label, fitted position, connector or terminal map, and every adjustable setting before removal.
-
What interface check is most important before replacing DS3800NGDD1C1B?Compare the receiving hardware and every keyed, numbered or polarized connection with the approved drawing.
-
How should settings be controlled when servicing DS3800NGDD1C1B?Photograph and transcribe jumpers, switches, firmware or range selections that apply to this exact execution.
-
What should be inspected before fitting DS3800NGDD1C1B?Inspect contacts, terminal hardware, board supports, protective earth and nearby wiring for damage or contamination.
-
Which companion hardware must be verified with DS3800NGDD1C1B?Confirm the associated controller, terminal board, rack, power source or field device named by the installed design.
-
How should energization be managed after installing DS3800NGDD1C1B?Restore energy in the approved sequence, watch diagnostics, and stop if the expected healthy state is not obtained.
-
What functional proof adds technical value for DS3800NGDD1C1B?Exercise the affected signal, protection, power or communications path and retain before-and-after readings.
-
What handover record is required after commissioning DS3800NGDD1C1B?Keep the exact part marking, installed photographs, settings, test results, deviations and responsible approval.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.