Technical specifications for DS200UPSAG1AFD
-
Manufacturer:General Electric
-
Product Category:Gas Turbine Control
-
Spare Part Number:DS200UPSAG1AFD
-
Weight:0.78 kg
-
Tariff Code:8537101190
-
Board acronym:UPSA
-
Functional class:Power supply board
-
Product context:UC2000 / EX2000
-
Protective devices:3 fuses
-
Status indication:1 LED
-
Board control:Reset button
-
Nine-pin connectors:3
-
Service points:On-board test points
Information
- GE DS200UPSAG1AFD is a UC2000/EX2000 power supply board with onboard protection, status indication and service test points.
Onboard protective interface: Fuses and reset control provide localized protection and service recovery.
Measured maintenance access: Status indication and test points support controlled power-supply diagnosis.
Use the verified technical rows below to screen the offer, then compare the installed drawing and manufacturer instructions. Board acronym: UPSA; Functional class: Power supply board; Product context: UC2000 / EX2000. These values do not authorize transferring specifications from a neighboring model.
During replacement, preserve the approved configuration and connection map. Perform a controlled visual, electrical and functional check, record the as-left result, and release the equipment only after the responsible site authority accepts the restored uc2000 power supply board.
DS200UPSAG1AFD Manufacturer Data Reference
Model-specific technical reference assembled from verified manufacturer-family records. PDF · 2 pages.DS200UPSAG1AFD Installation & Verification Guide
Field guide covering identity capture, connection checks, controlled installation and acceptance evidence for DS200UPSAG1AFD. PDF · 2 pages.
Application scope: Application suitability depends on the exact reference, hardware revision and installed configuration. Use site-approved drawings and manufacturer instructions for the final design decision.
Control-system power support
Use DS200UPSAG1AFD only in the compatible GE UC2000 / EX2000 power subsystem arrangement identified by the approved system documentation.Redundant or protected supply service
Preserve the installed identity, connector orientation and configuration while restoring the documented function.Measured power verification
Use recorded as-found values and approved tests to distinguish connection, companion-hardware and product faults.Commissioning support
Keep the complete DS200UPSAG1AFD reference and acceptance evidence with the asset record for future service.
Do not shorten DS200UPSAG1AFD or transfer data from an adjacent reference.
Photograph connector orientation and label each cable or terminal before removal.
Retain the approved GE UC2000 / EX2000 power subsystem database, jumpers, switches or channel assignment as applicable.
Follow the site energy-isolation and ESD procedure before disturbing hardware.
Check the documented base, cable, terminal, power and partner-module relationship.
Complete visual, electrical and functional checks before return to automatic service.
Alternative Names
Technical notes
Evidence boundary: Technical rows apply to DS200UPSAG1AFD or its explicitly identified manufacturer family context.
Compatibility: Physical fit does not establish electrical, firmware or system compatibility.
Commissioning: Use approved General Electric instructions and site procedures for final installation and release.
FAQ View All FAQ
-
Which input and output values must be confirmed for DS200UPSAG1AFD?Verify the nameplate input selection, frequency and documented DC output before connection; do not infer ratings from a similar supply.
-
How should the protective devices on DS200UPSAG1AFD be handled?Use only the documented fuse or protective-device type and rating, and investigate the cause before replacement or reset.
-
Why is load margin important when commissioning DS200UPSAG1AFD?The complete connected load, startup demand and redundancy arrangement must stay within the documented supply capability.
-
How should grounding be checked for DS200UPSAG1AFD?Confirm protective earth, signal-reference arrangement and enclosure bonding against the approved system drawing before energization.
-
What should be recorded before removing DS200UPSAG1AFD?Record terminal assignments, input selector position, connector orientation, status indications and measured input/output values.
-
Can DS200UPSAG1AFD be energized without its normal load?Only when the manufacturer procedure and site method permit it; use a controlled test arrangement and observe output stability.
-
How should redundant operation involving DS200UPSAG1AFD be proven?Test each supply path and transfer behavior under the approved maintenance condition without defeating required protection.
-
What as-left evidence is required for DS200UPSAG1AFD?Retain input/output measurements, load current, protective-device status, alarm state and the responsible approval reference.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.