Keep the complete 10 m calibrated cable chain together and record the 30 mm case-length code before replacement. Verify the 0.5 mm initial air gap, target geometry and converter configuration before dynamic acceptance.
Important Notice: Verify EZ1081-03-00-010 + EZ1901-090 from the physical marking and current manufacturer documentation before installation or configuration.
Important Notice: Use these model-specific records together with the current manufacturer publication and the installed-system documentation.









