The cable is installed as part of one calibrated transducer system and must not be substituted by length alone. Commissioning checks the order string, total electrical length, connector cleanliness, shield routing and complete loop response.
Important Notice: Confirm 330854-080-25-00, 8.0 m armored high-temperature execution, FluidLoc connectors, matched 25 mm probe and Proximitor Sensor, total system length, routing, shielding, grounding, monitor configuration, gap and controlled response-test results before commissioning.
Apter Power 330854-080-25-00 Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.