The processor operates with the AFV10S or AFV10D FCU, associated power modules and configured ESB or ER bus interfaces. Commissioning includes identity, partner-module state, control software, Vnet/IP path, node-unit recognition and controlled process-function verification.
Important Notice: Confirm CP451-10 S2, AFV10S or AFV10D host, processor partner, hardware style, power modules, Vnet/IP network, ESB/ER interfaces, CENTUM VP software and database versions, time synchronization, SEM requirement and controlled process-test results before commissioning.
Apter Power CP451-10 S2 Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.