Speak to a sourcing specialist
sales13@apterpower.com

6GK5206-2BS00-2AC2

SCALANCE XC206-2SFP Managed Industrial Ethernet Switch
In Stock
Siemens 6GK5206-2BS00-2AC2
Siemens 6GK5206-2BS00-2AC2
Siemens 6GK5206-2BS00-2AC2
Siemens 6GK5206-2BS00-2AC2
Siemens 6GK5206-2BS00-2AC2
Siemens 6GK5206-2BS00-2AC2
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

Siemens 6GK5206-2BS00-2AC2 is a SCALANCE XC206-2SFP managed Layer 2 Industrial Ethernet switch with six electrical ports and two SFP interfaces. It connects, segments and supervises industrial Ethernet and PROFINET networks.

Get a quick price for 6GK5206-2BS00-2AC2
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for 6GK5206-2BS00-2AC2

  • Manufacturer:
    Siemens
  • Product Category:
    PLC Systems
  • Spare Part Number:
    6GK5206-2BS00-2AC2
  • Estimated shipping dimensions:
    5.1 cm x 12.7 cm x 17.8 cm
  • Weight:
    0.5 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    Germany
  • Product designation:
    SCALANCE XC206-2SFP
  • Electrical ports:
    6 × 10/100 Mbit/s RJ45
  • SFP ports:
    2 × 100/1000 Mbit/s
  • Console ports:
    1
  • Power supply:
    Redundant
  • Signaling-contact voltage:
    24 V DC
  • Signaling-contact current:
    0.1 A maximum
  • Power connection:
    4-pole terminal block
  • C-PLUG slot:
    Yes
  • Protocols and profiles:
    PROFINET IO device; EtherNet/IP-compliant; RSTP; VLAN
  • Operating temperature:
    -40 to +70 °C
  • Mounting:
    DIN rail; S7 mounting rail; wall
  • Security certification:
    IEC 62443-4-2

Information

Overview Manuals Common Applications Product Precautions
6GK5206-2BS00-2AC2 provides managed Layer 2 switching, mixed copper and SFP connectivity and redundant supply inputs for an industrial Ethernet cell.
  • Segments industrial Ethernet traffic through a managed switching fabric
  • Extends the cell network over selectable optical media
  • Supports redundant network and supply concepts
  • Reports port, supply and signaling-contact diagnostics

The switch connects six 10/100 Mbit/s electrical links and two 100/1000 Mbit/s SFP links within the engineered network. Commissioning includes mounting and bonding checks, redundant power verification, SFP compatibility, C-PLUG handling, VLAN and redundancy restoration, PROFINET naming and controlled failover tests.

Important Notice: Confirm 6GK5206-2BS00-2AC2, XC206-2SFP hardware and firmware, mounting method, redundant 24 V supplies, protective bonding, RJ45 port map, SFP types, fiber polarity, C-PLUG, console access, PROFINET name, IP settings, VLAN and redundancy configuration, signaling contact and failover-test results before commissioning.

Apter Power 6GK5206-2BS00-2AC2 Manuals and Guides

The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.

PROFINET controller cells
Connects controllers, I/O stations and operator devices in a managed cell network.
Fiber uplinks between cabinets
Uses selected SFP media to extend the industrial network between panels.
Redundant ring architectures
Participates in the approved redundancy arrangement for controlled path recovery.
Harsh-environment machine networks
Provides managed switching in the documented extended-temperature installation.
Read the applicable Siemens installation instructions before work. Verify 6GK5206-2BS00-2AC2, the installed host system and all configured field interfaces before isolation, wiring or commissioning.
1
Confirm the complete 6GK5206-2BS00-2AC2 marking and installed XC-200 hardware version.
2
Archive the switch configuration, port map, VLANs and redundancy settings.
3
Isolate both redundant supply inputs and verify the signaling circuit is de-energized.
4
Record every RJ45, SFP, console and grounding connection before removal.
5
Use compatible SFP modules and keep optical interfaces clean and capped.
6
Restore the approved C-PLUG, PROFINET device name and management configuration.
7
Verify port speed, VLAN membership, ring state and alarm contact operation.
8
Prove network-path recovery and monitored-device communication before release.

Technical notes

Mount 6GK5206-2BS00-2AC2 on the approved DIN rail, S7 rail or wall position and connect both redundant supply paths to the documented four-pole terminal block. Restore the approved VLAN, redundancy, PROFINET and C-PLUG configuration, then verify copper and SFP links, signaling contact and network diagnostics.

FAQ View All FAQ

  • What exact function does 6GK5206-2BS00-2AC2 perform as a SCALANCE XC206-2SFP Managed Industrial Ethernet Switch?
    It provides managed Layer 2 copper and SFP switching for the configured industrial Ethernet cell.
  • Which host system must be confirmed before installing 6GK5206-2BS00-2AC2?
    Confirm the documented Siemens SCALANCE XC-200 managed switches host and the complete 6GK5206-2BS00-2AC2 marking before work.
  • Which connection checks are required for 6GK5206-2BS00-2AC2?
    Verify both supply paths, bonding, RJ45 connections, SFP modules, fiber polarity and the signaling contact.
  • How should the installed configuration for 6GK5206-2BS00-2AC2 be preserved?
    Restore the approved C-PLUG and management, PROFINET, VLAN and redundancy settings.
  • Which diagnostic evidence should be reviewed for 6GK5206-2BS00-2AC2?
    Review link, port, supply, redundancy and signaling-contact diagnostics.
  • What must be recorded before replacing 6GK5206-2BS00-2AC2?
    Record the full article number, hardware and firmware, port map, optics, addresses, VLANs and redundancy state.
  • How should 6GK5206-2BS00-2AC2 be commissioned after installation?
    Energize both supplies, verify links and management access, then test the approved redundancy path.
  • Which model-specific limitation applies to 6GK5206-2BS00-2AC2?
    SFP selection, port assignment and C-PLUG data must match the installed XC206-2SFP configuration.
Related reading

Related cases and sourcing guidance

View all case studies