Match the complete marking
Match the complete Siemens 6AV2123-2JB03-0AX0 marking, hardware execution and connection arrangement to the installed position before approving the order.
-
Check the offered item before ordering
Request clear photographs of the offered 6AV2123-2JB03-0AX0 and ask your maintenance team to compare its markings and interfaces with the installed equipment and applicable Siemens instructions.
Technical specifications for 6AV2123-2JB03-0AX0
-
Manufacturer:Siemens
-
Product Category:HMI Panels
-
Spare Part Number:6AV2123-2JB03-0AX0
-
Weight:1.14 kg
-
Tariff Code:8537101190
-
Display:9-inch TFT; 65536 colors
-
Resolution:800 x 480 pixels
-
Function keys:8
-
Touch technology:Analog resistive
-
Rated supply:24 V DC
-
Supply range:19.2-28.8 V DC
-
Rated consumption:230 mA
-
Typical power input:5.5 W
-
User-data memory:10 MB
-
Ethernet interfaces:1
-
USB interfaces:1; media up to 16 GB
-
Engineering baseline:WinCC Basic V13 / STEP 7 Basic V13
Information
- Siemens 6AV2123-2JB03-0AX0 supports project-assigned operator keys alongside touchscreen objects, with controller interlocks remaining responsible for permitted actions.
Communication boundary: Configured HMI-to-controller connection
Engineering role: Basic Panel runtime and project configuration
The Ethernet interface supports the configured controller connection, but the panel is not a general PROFINET IO device merely because its interface is described as PROFINET. Use the supported HMI driver and engineering configuration for the target controller.
Runtime data, alarm behavior and recipe handling are constrained by the Basic Panel feature set. Preserve the device type and project compatibility when migrating from another panel; matching display resolution alone does not preserve application behavior.
6AV2123-2JB03-0AX0 Original Technical Excerpt
The original technical excerpt supports 6AV2123-2JB03-0AX0 configuration review. The separate Apter Power field guide organizes practical diagnostic checks. PDF · 4 pages.6AV2123-2JB03-0AX0 Installation & Verification Guide
Apter Power engineering guide for the installed signal, power or communication path and controlled acceptance. PDF · 5 pages.
Application scope: The following uses describe supported engineering roles; they do not establish interchangeability with another model or remove application-specific validation.
Machine operator stations
Combine touch objects with project-assigned keys.Ethernet HMI connections
Exchange supported process data with the configured controller.Portrait or landscape installations
Use the supported mounting orientation and matching project layout.Basic Panel modernization
Assess functions and driver support before project migration.
Preserve the KTP900 Basic engineering project, runtime compatibility information, alarm and recipe data, and the configured Ethernet controller connection settings. Identify the controller tags behind operator commands and record the access levels required to use them. Check that the recovery method can restore the project, rather than relying on an image of the visible screens.
Place machine commands in the approved inhibited state before testing the touch interface or replacing the panel. Inspect the front seal separately from the rear cabinet connections. Check the power feed and supported USB media arrangement without assuming that arbitrary removable media or a similar connector is suitable.
Restore the project and the configured Ethernet controller connection with the correct controller endpoint. Check changing values at both the controller and panel, then compare units and tag destinations. Retain the original baseline until the new runtime and connection have been demonstrated under controlled conditions.
Generate an authorized test alarm and trace its acknowledgement back to the controller. Check a permitted setpoint or recipe transfer against controller limits and destination tags. Include assigned function-key behavior in the acceptance sequence so that a hardware-specific behavior is not concealed by a general screen test.
Restore normal operator access only after commands, indications and assigned function-key behavior have passed the agreed tests. Remove temporary test data and confirm that the production recipe and communication settings remain intact. Retain the accepted project and recovery files together with the installed KTP900 Basic hardware identity.
Use the exact hardware execution with the supported system configuration and installation conditions.
Alternative Names
Technical notes
Configuration baseline: Keep the installed SIMATIC HMI arrangement aligned with the complete 6AV2123-2JB03-0AX0 reference and its assigned system role.
Acceptance boundary: Compare the electrical or communication response with the intended application outcome before releasing maintenance controls.
Technical reference: Siemens product data sheet, 6AV2123-2JB03-0AX0. Use the exact hardware execution with the supported system configuration and installation conditions.
FAQ View All FAQ
-
Why is 6AV2123-2JB03-0AX0 not interchangeable with an arbitrary PROFINET IO device?Its Ethernet HMI connection is distinct from PROFINET IO-device functionality. Configure a supported controller driver and HMI connection. Do not add it to an IO topology as though it were a distributed input/output module.
-
What should be tested when function keys on 6AV2123-2JB03-0AX0 are reassigned?Check each key in the relevant screen context, including permissions and PLC interlocks. A correct label does not prove that the intended command tag is used. Test with hazardous actions inhibited before releasing normal operation.
-
Can a higher-tier HMI project be moved directly to 6AV2123-2JB03-0AX0?Only after checking the Basic Panel feature set and device compatibility. Review unsupported functions, memory usage and drivers, then validate the compiled project on the target. Similar screen size does not establish functional equivalence.
-
Why can 6AV2123-2JB03-0AX0 lose accurate time after extended storage without power?Clock retention is finite. Restore the intended time synchronization and compare event timestamps after return to service. A panel that retains its project can still require clock correction.
-
How should portrait installation of 6AV2123-2JB03-0AX0 be validated?Confirm the allowed mounting arrangement and configure the project for the intended orientation. Inspect readability and access to all controls, then verify cabinet temperature and sealing. Rotating the hardware alone does not produce a usable operator layout.
-
What separates a USB-media problem from a failed 6AV2123-2JB03-0AX0 restore?Confirm media compatibility and the expected backup format, then check that the backup matches the panel and runtime. File copying and successful device detection are separate steps from a valid project restoration.
-
Why should backlight settings be checked before replacing 6AV2123-2JB03-0AX0?The backlight is dimmable, so project or device settings can make a healthy display appear dark. Check power, brightness and startup behavior before concluding that the display hardware has failed.
-
How can a 6AV2123-2JB03-0AX0 command be traced when the PLC receives no action?Verify the active connection, tag address, user permission and controller interlock in sequence. Observe a controlled command at both the panel and PLC. A responsive touch object does not demonstrate that the process command crossed the communication boundary.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.