Speak to a sourcing specialist
sales13@apterpower.com

16137-114

Marshalled Interconnect I/O Cable Assembly
In Stock
Ships by Saturday, November 7
Fast Shipping Available
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

Siemens 16137-114 is the terminated 9.8 ft (3 m) Marshalled Interconnect I/O Cable Assembly listed for the APACS+ Voltage Input Module installation. It links the VIM position in the rack to the corresponding VIM Marshalled Termination Assembly while retaining the documented J1/P2 identification, mechanical keying and service sequence.

Get a quick price for 16137-114
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for 16137-114

  • Manufacturer:
    Siemens
  • Product Category:
    DCS Systems
  • Spare Part Number:
    16137-114
  • Estimated shipping dimensions:
    26x25x4cm
  • Weight:
    0.46 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    Germany
  • Product class:
    Marshalled Interconnect I/O Cable Assembly
  • Published length:
    9.8 ft (3 m)
  • Termination distinction:
    Terminated assembly; 16137-118 is the separately listed unterminated 3 m assembly
  • Documented installation context:
    APACS+ Voltage Input Module (VIM)
  • Rack-side connector designation:
    J1
  • Termination-assembly connector designation:
    P2
  • P2 mating location:
    A (J1) connector on the VIM Marshalled Termination Assembly
  • J1 lower attachment:
    Pin mounting hole over the lower captive screw
  • J1 upper attachment:
    Connector groove engages the extruded rear backplane spacer
  • J1 seating reference:
    Alignment pin engaged, flush with or slightly above the connector surface
  • J1 retention:
    Lower captive mounting screw
  • P2 mistake prevention:
    Connector keying pins installed to the VIM pattern in Figure 2-6
  • Keying kit referenced by the manual:
    16056-435 Cable Keying Kit
  • Required service identification:
    Match and record MODULNET node, rack and slot at both cable ends
  • P2 shell securing-screw limit:
    50 inch-pounds maximum
  • Removal sequence:
    Disconnect labeled P2, loosen J1 captive screw, clear the alignment pin, then withdraw the grooved upper edge
  • Replacement sequence:
    Route between cabinets, restore labels and keying, connect the cable, then reinstall the VIM
  • Redundant installation boundary:
    A redundant VIM arrangement uses a separately routed cable for each VIM path
  • Electrical safety before service:
    Remove power from all wires and terminals and verify hazardous voltage is absent
  • Hazardous-atmosphere service rule:
    Isolate power and signals before disconnecting cable or inserting/removing a module

Information

Overview Manuals Common Applications Product Precautions
Siemens 16137-114 is the terminated 9.8 ft (3 m) Marshalled Interconnect I/O Cable Assembly listed for the APACS+ Voltage Input Module installation. It links the VIM position in the rack to the corresponding VIM Marshalled Termination Assembly while retaining the documented J1/P2 identification, mechanical keying and service sequence.
  • Preserves the exact 9.8 ft (3 m) terminated cable identity
  • Connects the rack VIM position to the marshalled termination assembly
  • Uses documented J1/P2 mechanical keying and retention
  • Supports labeled removal and replacement without mixing I/O paths

The cable is one element of the VIM installation, not a source of channel count, input range or module accuracy ratings. Match the physical J1/P2 connectors, keying pattern, node/rack/slot labels and 3 m length to the installed VIM path before service.

Important Notice: Figure 2-6 depicts the cable-keying method for the installation family; the exact 16137-114 length is established separately by Table 5-2. Do not import the figure's other listed cable lengths into this order number.

Siemens 16137-114 Manuals & Downloads
Siemens 16137-114 Technical Reference (PDF)Siemens 16137-114 Manufacturer Manual Excerpt (PDF)

The manufacturer excerpt preserves 15 unchanged original pages covering source identity, safety, cable installation, keying, service removal/replacement and the exact 16137-114 order-table entry; it is not the complete manual.

VIM-to-marshalling interconnection
Routes the documented VIM cable path between the module rack and its VIM Marshalled Termination Assembly.
Exact 3 m cable renewal
Restores the published terminated 9.8 ft (3 m) assembly without substituting the separately listed unterminated version.
Controlled cabinet service
Retains the recorded node, rack and slot identity while the keyed connectors are removed and reinstalled.
Redundant VIM maintenance
Supports one separately identified cable path per VIM when the installed redundancy arrangement requires it.
Before handling Siemens 16137-114, place the process in the approved maintenance state and identify both cable ends against the installed VIM records.
1
Remove power from all wires and terminals, then verify hazardous voltage is absent before disconnection.
2
In hazardous atmospheres, isolate power and signals before disconnecting the cable or inserting or removing a module.
3
Record the MODULNET node, rack and slot on the J1 and P2 end labels before disturbing the routing.
4
Confirm the replacement is the terminated 16137-114 3 m assembly, not the unterminated 16137-118 entry.
5
Keep the connector keying pins in the documented VIM pattern so the P2 end cannot mate with a different I/O type.
6
Seat J1 by engaging the upper groove and alignment pin before tightening its lower captive screw.
7
Connect P2 to the termination assembly's A (J1) position and limit its shell securing screw to 50 inch-pounds.
8
After cable replacement, reinstall the VIM and verify the intended channel response under the approved commissioning procedure.

Technical notes

Use 16137-114 only for the documented marshalled VIM interconnection; do not substitute the separately listed 16137-118 unterminated assembly. Before disconnecting either end, remove power, verify hazardous voltage is absent and isolate power and signals when the installation is in a hazardous atmosphere.

FAQ View All FAQ

  • What distinguishes Siemens 16137-114 from the 16137-118 entry?
    16137-114 is listed as a terminated Marshalled Interconnect I/O Cable Assembly with a 9.8 ft (3 m) length. The same table lists 16137-118 as an unterminated 9.8 ft (3 m) assembly, so they must not be treated as the same service item.
  • Which end of 16137-114 connects to the VIM rack?
    The molded J1 end mounts at the VIM position in the rack. Its lower pin mounting hole, upper groove, alignment pin and captive screw control the mechanical seating; P2 is the termination-assembly end.
  • Where is the P2 end of 16137-114 installed?
    P2 connects to the A (J1) connector on the VIM Marshalled Termination Assembly. The cable labels at both ends should retain the same MODULNET node, rack and slot identity before service.
  • Why must the P2 keying pattern be preserved?
    The manual uses connector keying pins to prevent the cable from mating with a termination assembly assigned to another I/O type. Install the pins in the documented VIM pattern with the referenced 16056-435 kit; do not improvise a pattern from a neighboring module.
  • Does the 50 inch-pound value apply to every terminal in the installation?
    No. The stated maximum applies to the securing screw on top of the P2 connector shell. It is not a general field-terminal torque value and must not be transferred to unrelated terminals.
  • What is the controlled removal sequence for 16137-114?
    After the process is secured and hazardous voltage is absent, label and disconnect P2, loosen the J1 captive screw, arc the lower connector clear of the alignment pin, and withdraw the upper grooved edge from the backplane spacer before removing the route.
  • Does one 16137-114 cable make a VIM installation redundant?
    No. Redundancy is an installed system arrangement. The manual calls for a separate cable path for each VIM used in a redundant arrangement; this single cable does not create module redundancy by itself.
  • What safety condition is required before disconnecting 16137-114?
    Remove power from all wires and terminals and verify hazardous voltage is absent. In a hazardous atmosphere, isolate power and signals before any cable disconnection or module insertion or removal, and follow the installed equipment's approval markings.
Related reading

Related cases and sourcing guidance

View all case studies
Manufacturers

You May Also Like

Explore related automation components available through Apter Power.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.