The Siemens 6ES7400-0HR51-4AB0 is a SIMATIC S7-400H CPU 412-5H system bundle supplied with an UR2-H rack, two PS 405 10 A power supplies, two CPU 412-5H modules, four synchronization modules for distances up to 10 m, and two 1 m synchronization cables.
- CPU 412-5H system bundle
- 1 × UR2-H
- 2 × CPU 412-5H
- 2 × PS 405, 10 A, 24/48/60 V DC input
It provides the paired controller, rack, power-supply, and synchronization hardware used to build a high-availability S7-400H station. The two CPUs execute the engineered control program while the synchronization components maintain the redundant controller relationship; separately ordered memory cards and backup batteries are required.
Important Notice: Use the complete 6ES7400-0HR51-4AB0 code and verify the physical nameplate, project, accessories, and current Siemens documentation before installation or replacement.
Apter Power 6ES7400-0HR51-4AB0 Manuals and Guides
Important Notice: These are two separate Apter Power documents prepared from the manufacturer-published Siemens information named in each document. Confirm the physical nameplate, current Siemens documents, and host-system requirements before installation or replacement.
High-availability process control
Provides paired CPUs and synchronization hardware for controller redundancy
Continuous production
Supports engineered switchover strategies where controller downtime must be reduced
Utility and infrastructure automation
Hosts redundant control logic for continuously monitored plant services
Redundant S7-400 modernization
Supplies a coordinated 412-5H hardware set for an approved system design
Read and follow the exact Siemens documentation and host-equipment instructions before use. Verify 6ES7400-0HR51-4AB0 from the physical nameplate.
1
Bundle identity: Verify every included CPU, power supply, synchronization module, cable, and rack against the Siemens packing list
2
Missing items: Order and validate the two required memory cards and four backup batteries separately
3
Redundancy: Configure both CPUs with matching hardware, firmware, project, and synchronization parameters
4
Power: Confirm the PS 405 input voltage, protective grounding, load budget, and redundant supply arrangement
5
Commissioning: Test synchronization, redundancy events, diagnostics, and field I/O before production release