Bently
View products
The output demand, engineering limits and electrical limits determine the signal delivered to the field device. A commissioning check should compare the requested process value with the actual signal at the receiver, including the cable and load.
Important Notice: Keep the final control element under supervision while output demands or standby states are being tested.
The manufacturer excerpt covers the module connection and operating principles. The installation guide provides a separate sequence for wiring and functional checks.