Speak to a sourcing specialist
sales13@apterpower.com

CC-PCNT02 51454551-275

Process Control Processor Module
Honeywell CC-PCNT02 51454551-275
Honeywell CC-PCNT02 51454551-275
Honeywell CC-PCNT02 51454551-275
Honeywell CC-PCNT02 51454551-275
Honeywell CC-PCNT02 51454551-275
Honeywell CC-PCNT02 51454551-275
Product image is representative; revision or series may vary. Contact us to request a specific version.

Product Describe:

Honeywell CC-PCNT02 51454551-275 runs Experion PKS control strategies through the Control Execution Environment and exchanges process data with configured I/O links and peer nodes. Firmware selection determines the supported execution mode and integration functions.
  • Manufacturer part number
    CC-PCNT02 51454551-275
  • Shipping
    Swift global dispatch
  • Condition
    New, original product
  • Shipping size (est.)
    6.8cm x 15.9cm x 16.4cm
  • Country of Origin
    USA
Get a quick price for CC-PCNT02 51454551-275
E-mail *
Mobile
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 0

    Review your reference

    Send the complete CC-PCNT02 51454551-275 reference, label photos and installed Experion release.

  • 1

    Confirm the offer

    Review the offered revision, firmware compatibility and separately included IOTA or redundancy components.

  • 2

    Arrange dispatch

    Confirm quantity, delivery details and the agreed dispatch date before shipment arrangement.

  • Match the complete marking

    Provide the complete CC-PCNT02 51454551-275 marking, firmware and installed Experion release, together with the controller/IOTA arrangement.

  • Check the offered item before ordering

    Request label and connector photographs. Have your maintenance team compare the offered CC-PCNT02 51454551-275 with the installed controller, configuration and applicable Honeywell instructions.

Technical specifications for CC-PCNT02 51454551-275

  • Manufacturer:
    Honeywell
  • Product Category:
    DCS Systems
  • Spare Part Number:
    51454551-275
  • Weight:
    0.48 kg
  • Tariff Code:
    8537101190
  • Control network:
    Fault Tolerant Ethernet (FTE)
  • Device index range:
    1–510
  • I/O links:
    2
  • Standard CEE base period:
    50 ms
  • Optional CEE base period:
    20 ms; separate firmware and license
  • PM I/O link speed:
    375 kbaud; 50 ms CEE only
  • Series C I/O link speed:
    750 kbaud
  • Peer update periods:
    100, 200, 500 or 1000 ms
  • Time synchronization:
    SNTP or PTPv2
  • SNTP update interval:
    1 minute
  • PTP update interval:
    30 seconds
  • Redundant pair IOTAs:
    2
  • Redundant device indexes:
    Odd n and partner n+1
  • Redundancy cable medium:
    Shielded twisted-pair Ethernet
  • Parameter response rate:
    2500 parameters/s; 50 ms CEE
  • Subscribed display parameters:
    4000 maximum per controller
  • Slow request/response reads:
    3000 parameters/min; 50 ms CEE
  • Slow request/response writes:
    1500 parameters/min; 50 ms CEE
  • Incoming peer subscription rate:
    1000 parameters/s; 50 ms CEE
  • Outgoing peer subscription rate:
    1000 parameters/s; 50 ms CEE
  • Concurrent Push/Store requests:
    800 maximum
  • Push/Store starts per cycle:
    200 maximum
  • Whole-array transfer size:
    8 Kbytes; 1000 float64 elements
  • User processing budget:
    5500 XU; 50 ms CEE
  • CEE user memory:
    14,852 MU; 1 MU = 1024 bytes
  • Tagged blocks per CEE:
    4095 maximum; includes CEE and platform blocks
  • Component blocks per CM:
    100 maximum
  • Component blocks per SCM/RCM/MR:
    400 maximum
  • Concurrent sequence paths:
    15 maximum per SCM/RCM/MR

Information

Overview Downloads Applications / Compatibility Product Precautions
  • Honeywell CC-PCNT02 51454551-275 combines scheduled control, I/O servicing and peer communication within a shared processing budget. Engineering changes therefore need to consider timing, communication subscriptions and memory together.
Workload coordination: Control logic, I/O servicing and network exchange compete for the same controller processing resources.
Firmware-dependent operation: The optional fast-execution image changes supported I/O and control functions as well as timing.
Redundant-state management: Pair synchronization and process switchover are separate stages that need separate acceptance checks.
The C300 uses the Control Execution Environment to execute the installed control strategy. Its 50 ms configuration supports PM I/O and Series C I/O link arrangements, while the separately licensed 20 ms image is restricted to Series C I/O and has reduced integration capacity. Choosing a faster base cycle is a configuration change, not a general increase in controller capacity.

Peer subscriptions, operator displays and request/response traffic share the controller’s communication resources. Incoming report-by-exception traffic and outgoing subscription evaluation are accounted for differently. A quiet network trace can therefore conceal a substantial configured outgoing workload, and message count alone cannot establish sufficient processing headroom.

A redundant pair uses two IOTAs and adjacent device indexes with an odd first index. Restoring control execution after a switchover is different from completing synchronization of the returning partner. Acceptance should cover both controller roles, the actual I/O link arrangement and the process response, including any EtherNet/IP integration that can extend interruption time.
Controller platform reference: Honeywell Experion PKS C300 control architecture. Preserve the installed release, CEE image and approved I/O configuration.
Review the C300 configuration and performance tables alongside a separate restoration checklist. View PDF provides an Apter Power resource-planning review with worked communication examples.
Original manufacturer pages retain their technical context. Use the Apter Power guide with the applicable manufacturer instructions and approved installation design.
System and supply context: The CC-PCNT02 controller belongs to an Experion PKS C300 installation with an assigned IOTA, control network and project configuration. IOTAs, redundancy cables, supplies and software rights are separate items unless included in the quotation.

Application scope: Use the installed CEE image and Experion release to determine the applicable integration limits. PM I/O, advanced control and Ethernet Interface Module functions must not be assumed to remain available after a change to the fast-execution configuration.
Prepare Honeywell CC-PCNT02 51454551-275 for its configured installation using these checks.
Capture release and image

Retain the installed Experion release, controller firmware and CEE mode before replacement.

Reconcile paired indexes

Keep the odd device index and its n+1 partner aligned with the configured redundant pair.

Match I/O link types

Identify PM I/O and Series C link assignments before restoring the project.

Check the communication budget

Include subscribed parameters, displays, peer connections and requested update periods.

Separate recovery stages

Verify control recovery and partner synchronization independently after a planned switchover.

Accept the process path

Confirm representative I/O, output actions, alarms and cleared temporary test states before release.

Alternative Names

Honeywell CC-PCNT02 51454551-275 Honeywell CC PCNT02 / 51454551 275

Technical notes

Execution-mode boundary: The optional 20 ms CEE requires a separate firmware image and license. It supports Series C I/O only, and SCM/RCM/MR functions are not supported in that configuration.

Report-by-exception accounting: Incoming peer PPS benefits from source report-by-exception filtering. Outgoing peer capacity is calculated before that filtering, so unchanged subscribed parameters still consume the outgoing capacity budget.

Switchover conditions: The nominal control-processing interruption is 500 ms for 50 ms CEE and 200 ms for 20 ms CEE. Dual I/O-link faults can take several seconds; Direct or Through EIM EtherNet/IP configurations can extend interruption to 2.5 seconds.

Extended firmware functions: EIM and Profit Controller integration require the CC-PCNT02 extended-functionality firmware image. Hardware identity alone does not establish that those functions are enabled.

FAQ View All FAQ

  • Can the 50 ms project in CC-PCNT02 51454551-275 simply be accelerated to the 20 ms image?
    No. The 20 ms image requires a separate firmware and license and supports a narrower function set. Review PM I/O, sequence modules and integration functions before planning a conversion; faster execution is not a transparent timing adjustment.
  • Why can CC-PCNT02 51454551-275 reach its outgoing peer limit when most values are steady?
    Outgoing peer capacity is counted before report-by-exception filtering. Include every requested subscription at its update rate in the calculation, even if steady values produce little network traffic.
  • How should mixed peer update rates be budgeted for CC-PCNT02 51454551-275?
    For a 50 ms CEE, convert each group to parameters per second and add them. For example, 50 values at 100 ms plus 100 at 200 ms use 500 + 500 = 1000 parameters/s, reaching the peer-rate limit before other applicable resource checks.
  • Does rapid process recovery prove that a redundant CC-PCNT02 51454551-275 pair is fully restored?
    No. Control interruption and initial synchronization are different timings. Check that the partner reaches the required synchronized state and that both roles and paths are healthy, rather than accepting the pair solely because the process resumed.
  • Why must a spare paired with CC-PCNT02 51454551-275 retain an odd/even device-index relationship?
    A redundant pair uses odd index n and partner n+1. Reconcile the physical pair, both IOTAs and the configured indexes so that the replacement joins the intended redundancy relationship.
  • What can extend the control interruption during switchover of CC-PCNT02 51454551-275?
    Dual I/O-link failures can extend interruption into seconds. EtherNet/IP integration, directly or through EIM, can also increase it to 2.5 seconds. Base the acceptance test on the actual integration architecture, not just the nominal controller timing.
  • Will empty memory make an overloaded CC-PCNT02 51454551-275 control strategy run faster?
    Not necessarily. Memory and processing are separate resources. Review control execution, I/O service load and communication demand in the processing model; free memory does not compensate for exhausted execution capacity.
  • Why might EIM or Profit Controller functions be unavailable on CC-PCNT02 51454551-275 after replacement?
    Those functions need the CC-PCNT02 extended-functionality firmware image and a compatible configured system. Compare the restored firmware and project requirements before diagnosing their absence as a physical controller failure.
Manufacturers

Product Browsing History

Revisit the products you recently viewed on Apter Power.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.