Speak to a sourcing specialist
sales13@apterpower.com
Get a quick price for 10300/1/1
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for 10300/1/1

  • Manufacturer:
    Honeywell
  • Product Category:
    DCS Systems
  • Spare Part Number:
    136-010875B
  • Estimated shipping dimensions:
    4x21x12.8cm
  • Weight:
    0.65 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    USA
  • Input voltage:
    24 Vdc
  • Output voltage:
    5 Vdc
  • Output current:
    12 A
  • Coating:
    Conformal

Information

Overview Manuals Common Applications Product Precautions
Honeywell 10300/1/1 is a conformally coated 24 Vdc-to-5 Vdc, 12 A power converter. It supplies five-volt power to the configured Safety Manager cabinet electronics.
  • Converts cabinet 24 Vdc into the five-volt system supply
  • Feeds Safety Manager chassis electronics
  • Supports multi-supply cabinet arrangements
  • Provides a coated converter assembly

10300/1/1 installs with Safety Manager chassis, 24 Vdc cabinet feed, Five-volt distribution path, Converter mounting hardware in an engineered Safety Manager configuration.

The commissioning workflow covers installed-hardware matching, controlled start-up and functional verification for this coated 24 vdc to 5 vdc power converter.

Important Notice: Confirm the complete 10300/1/1 marking, installed-system configuration, field connections and controlled functional test before commissioning or replacement.

Apter Power 10300/1/1 Manuals and Guides
Apter Power 10300/1/1 Product Technical Reference PDFApter Power 10300/1/1 Installation and Verification PDF
The first document is an Apter Power model-specific technical reference. The second supports model-specific installation, configuration and engineering verification.
Safety Manager cabinet powerConverts cabinet 24 Vdc into the five-volt system supply
Redundant supply maintenanceFeeds Safety Manager chassis electronics
Five-volt rail restorationSupports multi-supply cabinet arrangements
Safety-system power conversionProvides a coated converter assembly
Read the applicable Honeywell installation instructions before work. Verify 10300/1/1 and the installed Safety Manager configuration.
1Verify the complete 10300/1/1 marking and its assigned Safety Manager position before work.
2Isolate the energy associated with Safety Manager chassis before disconnecting 10300/1/1.
3Protect the 10300/1/1 connectors and electronic assembly using approved ESD controls.
4Record the as-found 24 Vdc cabinet feed connections and configured assignment before replacement.
5Confirm Five-volt distribution path matches the approved installation record for 10300/1/1.
6Restore 10300/1/1 under controlled conditions and review its model-specific diagnostics.
7Complete a documented functional test for safety manager cabinet power before release.

Technical notes

Isolate the 24 Vdc feed, confirm converter position and polarity, then measure the five-volt rail under controlled load before re-enabling dependent chassis modules.

FAQ View All FAQ

  • How should engineers validate 10300/1/1 after configuration?
    Restore the documented Safety Manager assignment, review diagnostics and run a controlled test of its role: converts cabinet 24 vdc into the five-volt system supply.
  • Can 10300/1/1 be moved to a different slot or duty without review?
    No. Confirm keying, companion hardware and the approved configuration before assigning 10300/1/1 to another position or function.
  • Which technical value is especially important during 10300/1/1 commissioning?
    Verify Coating is Conformal and use the named manufacturer procedure for the controlled functional test.
  • What should be checked if 10300/1/1 does not support redundant supply maintenance after installation?
    Check seating, 24 Vdc cabinet feed, Five-volt distribution path, field energy and the model-specific diagnostics before replacing additional hardware.
  • What evidence should be retained after 10300/1/1 returns to service?
    Retain the full model identity, as-left connections, configuration, diagnostic result and the final controlled test record for safety manager cabinet power.
  • How is 10300/1/1 identified before installation in a Safety Manager cabinet?
    Match the full 10300/1/1 marking and part number 136-010875B to the assigned position and installed Safety Manager chassis.
  • Which companion hardware must be checked when replacing 10300/1/1?
    Verify Safety Manager chassis, 24 Vdc cabinet feed and Five-volt distribution path against the approved cabinet and project record before fitting the Coated 24 Vdc to 5 Vdc Power Converter.
  • What wiring information should be recorded before removing 10300/1/1?
    Record terminal identifiers, polarity or phase, shields, cable tags and the as-found channel or port assignment for 10300/1/1.
Related reading

Related cases and sourcing guidance

View all case studies
Manufacturers

Product Browsing History

Revisit the products you recently viewed on Apter Power.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.