Technical specifications for A06B-0104-B111#7000
-
Manufacturer:General Electric
-
Product Category:General Automation
-
Spare Part Number:A06B-0104-B111#7000
-
Estimated shipping dimensions:6x28.5x38cm
-
Weight:4.35 kg
-
Tariff Code:8537101190
-
Counliy of origin:USA
-
Equipment class:AC servo motor
-
Motor designation:Model 1-0E
-
Catalog family:A06B
-
Configuration suffix:#7000
-
System interface:CNC servo axis
-
Feedback path:Motor feedback connector
-
Power path:Servo-amplifier motor output
Information
- Provides the rotary actuator for one configured CNC feed axis
- Uses the complete B111#7000 motor and feedback execution
- Closes the axis loop through the matched motor-feedback path
- Supports controlled alignment and direction checks after installation
A06B-0104-B111#7000 is installed with matched GE Fanuc servo amplifier, CNC axis-control channel, motor power and feedback cables, machine coupling and holding arrangement.
Engineered applications include Machine-tool feed-axis renewal, Servo motor and feedback-loop verification, CNC axis alignment and direction testing, Installed motion-system restoration.
Important Notice: Match the complete A06B-0104-B111#7000 nameplate, shaft, connector and feedback execution before installation; isolate the servo bus, secure the axis, then prove rotation direction, feedback polarity and travel limits at reduced speed.
Apter Power A06B-0104-B111#7000 Manuals and Guides
Apter Power A06B-0104-B111#7000 System Technical Reference PDFApter Power A06B-0104-B111#7000 Field Installation and Acceptance Workbook PDFThe first document consolidates model-specific technical identity and system context. The second provides a separate field workflow for installation, connection checks and commissioning records.
Machine-tool feed-axis renewal
Restores the documented rotary actuator at a configured linear or rotary machine axis.
Servo motor and feedback-loop verification
Confirms power-phase order and feedback direction as one coordinated servo-loop test.
CNC axis alignment and direction testing
Supports recommissioning after motor, coupling or feedback-cable service.
Installed motion-system restoration
Provides a controlled path for checking brake, travel limit and axis-reference behavior where fitted.
Verify the complete A06B-0104-B111#7000 marking and the assigned GE Fanuc CNC servo-axis system position before work.
Place the connected machine or process in the approved maintenance state before disturbing A06B-0104-B111#7000.
Isolate the applicable power and field energy, then confirm a safe state before disconnecting A06B-0104-B111#7000.
Record connector, conductor, slot and configuration identities before removal of A06B-0104-B111#7000.
Use ESD controls and protect keyed interfaces, exposed contacts and electronic assemblies during handling.
Confirm that the installed companion hardware and approved project match the A06B-0104-B111#7000 arrangement.
Restore power in a controlled sequence and review device, rack and host diagnostics.
Prove the intended function and retain the final test result before returning A06B-0104-B111#7000 to service.
Technical notes
FAQ View All FAQ
-
What installed system position is assigned to A06B-0104-B111#7000?Confirm the documented GE Fanuc CNC servo-axis system position, complete catalog identity and mating hardware before removing A06B-0104-B111#7000.
-
Which connection records are needed before replacing A06B-0104-B111#7000?Record each connector, conductor, shield, polarity, jumper and position identifier in the as-found state.
-
How should energy be isolated before handling A06B-0104-B111#7000?Use the host-equipment isolation procedure, remove applicable control and field energy, discharge stored energy and prove the required safe state.
-
What compatibility checks apply to A06B-0104-B111#7000?Match A06B-0104-B111#7000 to the exact host platform, assigned position, interfaces, hardware revision and approved project record.
-
How should engineers configure A06B-0104-B111#7000 after installation?Restore only the approved installed-system settings and assignments; do not transfer parameters from a visually similar catalog number.
-
Which diagnostics should be reviewed when commissioning A06B-0104-B111#7000?Check local indications, host diagnostics, interlocks and the complete commanded or measured signal path before automatic operation.
-
How is the functional path of A06B-0104-B111#7000 tested?Apply a controlled test from the originating command or field condition through the connected hardware and record the final response.
-
What maintenance evidence should be retained for A06B-0104-B111#7000?Retain the as-found record, installed position, revision identity, configuration reference, diagnostic state and signed acceptance result.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.






