Build a load schedule that shows the normal and worst-case demand of every connected device, then compare the sum with the card-level limit before energization.
Commission the group in stages so each output is proven without masking a voltage-drop, overcurrent or shared-supply problem elsewhere on the card.
Important Notice: Passing a single-channel check does not prove the installation; the complete output group must remain within the shared-bus capacity.
The Technical Reference explains the high-side shared-bus architecture, B6 keying and current limits. The Installation & Commissioning Guide covers load calculation, supply distribution and staged group acceptance.