The extension cable completes the coaxial signal path and system length between an NSv probe and matched Proximitor Sensor. The installation uses the manufacturer-specified host position, companion hardware and field/control wiring for the intended industrial application.
System commissioning includes identity checks, connection verification, controlled energization and functional diagnostics for 330930-065-03-05.
Important Notice: Confirm the complete 330930-065-03-05 marking, approved system arrangement, connection records and controlled functional test before commissioning or replacement.