The monitor operates with four installed proximity-transducer signals arranged as two differential pairs. Commissioning includes rack position, input pairing, polarity, zero, alarm setpoints, recorder outputs and controlled response checks.
Important Notice: Confirm 3300/45-02-01-02-00, 3300 rack, hardware revision, four proximity inputs, two differential pairs, probe polarity, scale factors, zero positions, alarm setpoints, recorder outputs, grounding and controlled channel-test results before commissioning.
Apter Power 3300/45-02-01-02-00 Manuals and Guides
The first document is the model-specific technical and system reference. The second is a distinct field workbook for installation, wiring, commissioning and acceptance records.