Confirm the cable is routed to the documented external termination block and temperature-module I/O arrangement. When thermocouple sensors are used, verify the required 60X/ETB02 block and terminal identification before commissioning.
Important Notice: Confirm quotation scope, physical marking, included accessories and installed-system compatibility before work.
Important Notice: The first document is an Apter Power model-specific technical reference; the second link is the unmodified official manufacturer publication.