Match the complete marking
Include the complete ABB MV570 1TNA928300R0001 marking and any hardware revision on the item. Record the HMI project, Android/software versions and network identity.
-
Check the offered item before ordering
Request available label and connector photos. Have your maintenance team compare the offered MV570 1TNA928300R0001 with the installed equipment and applicable ABB documents.
Technical specifications for MV570 1TNA928300R0001
-
Manufacturer:ABB
-
Product Category:HMI Panels
-
Spare Part Number:MV570 1TNA928300R0001
-
Weight:2.3 kg
-
Tariff Code:8537101190
-
Display technology:TFT with LED backlight
-
Display resolution:800 × 600 pixels
-
Touch technology:Capacitive
-
Processor:i.MX6 dual-core, 800 MHz
-
Memory:1 GB DDR3 SDRAM
-
Flash storage:4 GB eMMC
-
Ethernet:1 × 10/100/1000 Mbit/s, PoE
-
USB:2 × USB 2.0 Host Type A
-
Supply:24 V DC
-
Power consumption:8 W typical at 24 V DC
-
RTC backup:Approximately 6 hours at 25°C
-
Operating temperature:0 to +55°C
-
Front protection:IP65 when correctly installed
-
Humidity:5–90%, noncondensing
Information
- ABB MV570 1TNA928300R0001 provides a local operator interface for viewing and controlling the configured switchgear application through its touchscreen and network connection.
Platform: Dual-core processor, 1 GB DDR3
Interfaces: Gigabit Ethernet and two USB Host ports
One Ethernet port supports 10/100/1000 Mbit/s networking, and two USB Host Type A ports support the intended peripherals or service operations. Network identity, application data and operator permissions belong to the configured installation and must be retained during replacement.
The front protection rating depends on correct panel mounting and gasket compression. The real-time clock uses a supercapacitor with approximately six hours of backup at 25°C, so extended power loss requires a time check before accepting event records.
MV570 1TNA928300R0001 Official English Function Excerpt
The ABB English excerpt describes MV570 monitoring, parameterization, control, maintenance and user-management functions in the MNS Digital system. PDF · 1 page.MV570 1TNA928300R0001 Installation & Verification Guide
Apter Power installation and verification guide covering project backup, mounting, power, communications and operator-function tests. PDF · 5 pages.
Application scope: Use it for configured local visualization, operator interaction and system diagnostics after restoring the approved application.
Local visualization
Display the configured switchgear status and measurements.Operator interaction
Use the capacitive touchscreen for the permitted application commands.Networked supervision
Exchange project data over the installed Ethernet connection.Maintenance access
Use the intended USB and software service functions under controlled access.
Save the application and communication settings before removal.
Confirm Android and project versions for the supplied unit.
Disconnect power before installation or internal handling.
Fit the gasket and retain the correct clamp arrangement.
Do not use screwdrivers or sharp tools on the screen.
Check the clock and operator access after restoration.
Alternative Names
Technical notes
Signal and interface: Typical consumption is 8 W at 24 V DC. Verify the actual power connection and network arrangement of the installed panel.
Installation boundary: IP65 applies from the front when installed correctly. The panel requires a noncondensing environment and operation within 0 to +55°C.
Technical basis: ABB MV570 User Manual, 1TNC928212M2002, Rev. B. MV570 article 1TNA928300R0001 is the central HMI. Android and application versions depend on the supplied hardware and software configuration.
FAQ View All FAQ
-
Which display resolution does MV570 1TNA928300R0001 use?The display resolution is 800 × 600 pixels with TFT/LED backlighting and capacitive touch.
-
What memory resources are available in MV570 1TNA928300R0001?The panel has 1 GB DDR3 SDRAM and 4 GB eMMC storage.
-
Does MV570 1TNA928300R0001 use a fixed Android version across all production units?The Android version can vary with production and supplied configuration; match it to the installed application before replacement.
-
How many wired network ports are fitted to MV570 1TNA928300R0001?There is one 10/100/1000 Mbit/s Ethernet port with PoE capability.
-
What USB connections are provided by MV570 1TNA928300R0001?Two USB 2.0 Host Type A ports are available for compatible peripherals and service operations.
-
How long can the clock in MV570 1TNA928300R0001 retain time without power?The supercapacitor provides approximately six hours of RTC backup at 25°C; verify the clock after a longer outage.
-
Does IP65 cover the entire enclosure of MV570 1TNA928300R0001?The IP65 rating applies from the front when the panel and gasket are installed correctly.
-
What should be tested after restoring the project on MV570 1TNA928300R0001?Verify display quality, touchscreen response, network data, alarms, time stamps and operator command permissions using the actual project.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.