Verify the workstation generation and an available 5 V PCI slot before installing PU514. For current migration work, use the ABB-documented external RTA replacement rather than assuming support for the legacy board.
Important Notice: Confirm the complete ABB PU514 identity and controlled configuration before commissioning.
The first document presents model-specific technical and system data. The second provides a separate installation, connection, commissioning and acceptance workflow.