Get Parts Quote
Name
Company *
Phone *
Email *
Address
City
State / Province / Region
Zipcode
Country
Quantity *
Part Number *
Manufacturer
Preferred Condition
Additional Information
Cancel

1MRK000508-BDR06

Relion 670 Series Binary Input Module
In Stock
Ships by Tuesday, September 22
Fast Shipping Available

Product Describe:

ABB 1MRK000508-BDR06 is a Relion 670 Series binary input module based on the documented 1MRK000508-BD sixteen-input execution. It acquires station binary signals for the installed protection and control IED.

Ask our team:

Get a quick price for: 1MRK000508-BDR06
Quantity*
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy.

Technical specifications for 1MRK000508-BDR06

Technical specifications for 1MRK000508-BDR06

  • Manufacturer:
    ABB
  • Product Category:
    General Automation
  • Spare Part Number:
    1MRK000508-BDR06
  • Estimated shipping dimensions:
    23.2x16.8x1.5cm
  • Weight:
    0.28 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    Sweden
  • Base ordering number:
    1MRK000508-BD
  • Module type:
    Binary input module
  • Input channels:
    16
  • System family:
    Relion 670 Series

Information

Information

Overview Manuals Common Applications Product Precautions
1MRK000508-BDR06 provides sixteen binary inputs for the documented Relion 670 protection and control arrangement.
  • Acquires sixteen documented binary inputs
  • Interfaces station status signals with the IED
  • Maintains the approved Relion hardware position
  • Supports controlled point-by-point input testing

The module receives station status and interlocking signals through the installed terminal execution. Commissioning verifies the complete channel map, field isolation, input logic and IED indication path.

Important Notice: Confirm ABB 1MRK000508-BDR06, base order 1MRK000508-BD, Relion 670 host, sixteen-channel map, input-voltage class, terminals, commons, grounding, IED configuration and point-test results before commissioning.

Apter Power ABB 1MRK000508-BDR06 Manuals and Guides

The first document presents model-specific technical and system data. The second provides a distinct installation, connection, commissioning and acceptance workflow.

Breaker-status acquisition
Brings documented auxiliary-contact states into the protection IED.
Protection interlocking
Acquires binary permissive and blocking signals in the approved logic.
Alarm and indication input
Transfers station equipment states to IED supervision functions.
IED hardware replacement
Restores the exact input-module execution with a verified channel map.
Read the applicable ABB installation instructions before work. Verify 1MRK000508-BDR06, the installed host system and all configured field interfaces before isolation, wiring or commissioning.
1
Confirm ABB 1MRK000508-BDR06 and base ordering number 1MRK000508-BD.
2
Place the protected equipment and IED logic in the approved maintenance state.
3
Isolate every connected binary-input circuit and apply ESD controls.
4
Record all sixteen channel assignments, terminal labels, commons and input-voltage class.
5
Confirm the Relion 670 slot and installed terminal execution.
6
Restore the approved channel map and IED hardware configuration.
7
Review module recognition, input states, sequence-of-event indications and self-supervision.
8
Simulate every assigned input and confirm the intended logic response before release.

Alternative Names

Alternative Names

1MRK000508-BD

Technical notes

Technical notes

Record all sixteen input assignments, terminal labels, input-voltage class and IED hardware position before removing 1MRK000508-BDR06. Restore the approved input map and perform controlled channel simulation with normal IED diagnostics before enabling protection logic.

FAQS

  • How should input-voltage class be verified for ABB 1MRK000508-BDR06?
    Confirm ABB 1MRK000508-BDR06, base order 1MRK000508-BD, Relion 670 host, sixteen-channel map, input-voltage class, terminals, commons, grounding, IED configuration and point-test results before commissioning.
  • Which record controls sixteen channel map on ABB 1MRK000508-BDR06?
    Record all sixteen input assignments, terminal labels, input-voltage class and IED hardware position before removing 1MRK000508-BDR06. Restore the approved input map and perform controlled channel simulation with normal IED diagnostics before enabling protection logic.
  • What must be preserved for ring-lug terminals when servicing ABB 1MRK000508-BDR06?
    Record all sixteen channel assignments, terminal labels, commons and input-voltage class.
  • How is field isolation isolated before work on ABB 1MRK000508-BDR06?
    Place the protected equipment and IED logic in the approved maintenance state. Isolate every connected binary-input circuit and apply ESD controls.
  • What official check applies to channel polarity for ABB 1MRK000508-BDR06?
    Confirm the Relion 670 slot and installed terminal execution.
  • How is IED configuration restored after fitting ABB 1MRK000508-BDR06?
    Restore the approved channel map and IED hardware configuration.
  • Which diagnostic confirms binary simulation for ABB 1MRK000508-BDR06?
    Review module recognition, input states, sequence-of-event indications and self-supervision.
  • What proves acceptance record is accepted for ABB 1MRK000508-BDR06?
    Simulate every assigned input and confirm the intended logic response before release.
Trusted by 5,000+ plants worldwide | Backed by our vast inventory of top-tier control parts, modules and cards, fast shipments are dispatched to cover your urgent needs. ABOUT US >>
Disclaimer: We are not an authorized distributor or distributor of the product manufacturer of this website, The product may have older date codes or be an older series than that available direct from the factory or authorized dealers. Because our company is not an authorized distributor of this product, the Original Manufacturer`s warranty does not apply.While many DCS PLC products will have firmware already installed, Our company makes no representation as to whether a DSC PLC product will or will not have firmware and, if it does have firmware, whether the firmware is the revision level that you need for your application. Our company also makes no representations as to your ability or right to download or otherwise obtain firmware for the product from our company, its distributors, or any other source. Our company also makes no representations as to your right to install any such firmware on the product. Our company will not obtain or supply firmware on your behalf. It is your obligation to comply with the terms of any End-User License Agreement or similar document related to obtaining or installing firmware.

We’re Here When You Need Us

From product insights to customer service needs, our experienced service team will focus on getting you what you need quickly

Enquire

Complete our online form.

Call Us

Speak to one of our team.

Live Chat

Send us a message.