The Siemens 6ES7288-6EC01-0AA0 is a SIMATIC S7-200 SMART 1 m I/O Expansion Cable that extends the documented I/O expansion connection across a two-tier S7-200 SMART or ET 200 SMART arrangement.
- 1 m I/O Expansion Cable
- 1 m expansion-bus cable for a documented two-tier arrangement
- Passive expansion-bus accessory; use only with the Siemens-listed CPU and expansion arrangement
- 126 x 185 x 42 mm packaged; 1 m cable length
In a correctly engineered SIMATIC S7-200 SMART installation, it carries the system expansion-bus connection between the supported CPU or interface module and the documented expansion tier. It works with the exact host hardware, power, wiring, field devices, firmware, and project configuration published for this complete article number. It is applied in control panels that require a Siemens-approved two-tier expansion-module layout.
Important Notice: Use the complete 6ES7288-6EC01-0AA0 code and verify the physical nameplate, current Siemens documentation, supply, wiring, project, firmware, and accessories before installation or replacement.
Apter Power 6ES7288-6EC01-0AA0 Manuals and Guides
Important Notice: These are two separate Apter Power documents prepared from the manufacturer-published Siemens information named in each document. Confirm the physical nameplate, current Siemens documents, and host-system requirements before installation or replacement.
Two-tier control cabinet
Routes the expansion-bus connection between documented panel tiers
Remote row arrangement
Provides the specified 1 m physical reach without substituting a generic cable
Expansion-module continuity
Carries the approved system connection to the next module row
Panel layout optimization
Supports control panels that require a Siemens-approved two-tier expansion-module layout while retaining the Siemens-documented topology
Read and follow the current Siemens source and applicable installation instructions before use. Verify 6ES7288-6EC01-0AA0, 1 m I/O Expansion Cable, host system, supply, wiring, firmware, and project from the physical installation.
1
Match 6ES7288-6EC01-0AA0, the 1 m length, and both connector ends to the Siemens two-tier drawing before installation.
2
Remove power from the CPU/interface module and all expansion modules before connecting or disconnecting the cable.
3
Do not use the cable as a lifting point; observe connector orientation, latch engagement, bend clearance, and strain relief.
4
Route the cable away from sharp edges, heat sources, moving parts, and high-noise power conductors; do not extend it with a generic cable.
5
After installation, verify expansion-module recognition, diagnostics, grounding, and end-to-end operation before returning the station to service.