Speak to a sourcing specialist
sales13@apterpower.com
Get a quick price for SC-UCNN11
E-mail *
Mobile *
Company
Content *
Quantity *
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy

What happens after you enquire

  • 1

    Requirement review

    We review the part number, quantity and delivery requirements and ask for any missing details.
  • 2

    Quotation and availability

    We confirm the proposed item, condition, availability, price and estimated lead time in the quotation.
  • 3

    Order confirmation and dispatch

    Once the quotation and purchasing details are agreed, your contact will coordinate the order and available dispatch information.

Technical specifications for SC-UCNN11

  • Manufacturer:
    Honeywell
  • Product Category:
    DCS Systems
  • Spare Part Number:
    51307573-176
  • Estimated shipping dimensions:
    5.6x12.6x13cm
  • Weight:
    0.26 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    USA
  • Controller configuration:
    Redundant
  • Rated supply:
    24 Vdc +/-25%
  • Input range:
    18 to 30 Vdc
  • Supply ripple:
    120 mVpp maximum
  • Input current:
    1.3 A maximum at 30 Vdc with 9 I/O modules
  • Power without expansion:
    5.76 to 6.72 W
  • Power with expansion:
    6.96 W

Information

Overview Manuals Common Applications Product Precautions
Honeywell SC-UCNN11 is a redundant ControlEdge RTU controller used in paired remote-automation installations that require controller availability.
  • Provides redundant RTU processing
  • Coordinates primary and secondary controllers
  • Maintains remote communications
  • Supports external I/O expansion

SC-UCNN11 operates with Matched SC-UCNN11 controller, Redundant RTU backplane, Independent 24 Vdc feeds, ControlEdge I/O expansion.

Its engineered use includes Redundant pipeline RTUs, Critical remote compressor sites, Water transmission stations, Unattended production facilities.

Important Notice: Confirm the complete SC-UCNN11 marking, installed-system configuration, field connections and controlled functional test before commissioning or replacement.

Apter Power SC-UCNN11 Manuals and Guides
Apter Power SC-UCNN11 Product Technical Reference PDFHoneywell SC-UCNN11 Official Technical Manual PDF
The first document is an Apter Power model-specific technical reference. The second supports installation, configuration and engineering verification for SC-UCNN11.
Redundant pipeline RTUsProvides redundant RTU processing
Critical remote compressor sitesCoordinates primary and secondary controllers
Water transmission stationsMaintains remote communications
Unattended production facilitiesSupports external I/O expansion
Read the applicable Honeywell instructions before work. Verify SC-UCNN11 and the installed ControlEdge RTU configuration.
1Verify the complete SC-UCNN11 marking and its assigned ControlEdge RTU position before work.
2Isolate the applicable power and field energy before disconnecting SC-UCNN11.
3Protect SC-UCNN11 connectors and electronic assemblies with approved ESD controls.
4Record the installed wiring, channel assignment and configuration before replacement.
5Match Matched SC-UCNN11 controller and Redundant RTU backplane to the documented system arrangement.
6Commission SC-UCNN11 with controlled status, signal and diagnostic checks.
7Retain the final redundant pipeline rtus functional-test result in the maintenance record.

Technical notes

Confirm controller pairing, independent supply paths and redundancy status before transferring the active role or loading a revised application.

FAQ View All FAQ

  • Does SC-UCNN11 match Matched SC-UCNN11 controller in a Redundant pipeline RTUs installation?
    Verify the complete SC-UCNN11 marking, the documented ControlEdge RTU position and the installed Matched SC-UCNN11 controller before fitting the assembly.
  • How should SC-UCNN11 be wired when it must provides redundant rtu processing?
    Isolate the circuit, identify every terminal and reproduce the approved polarity, shield and channel assignment for SC-UCNN11; then continuity-test the affected path.
  • Which ControlEdge RTU records should be captured before removing SC-UCNN11?
    Record the as-found wiring, installed position, active configuration and diagnostic state associated with SC-UCNN11 before disconnection.
  • What controlled test confirms that SC-UCNN11 can coordinates primary and secondary controllers?
    Apply the approved field or simulated stimulus, observe the ControlEdge RTU indication and confirm the intended response without bypassing the normal interlocks.
  • Which Redundant RTU backplane condition should be checked when SC-UCNN11 reports an abnormal state?
    Check the Redundant RTU backplane supply, seating and connection first, then compare channel diagnostics with the recorded SC-UCNN11 baseline.
  • Can SC-UCNN11 be moved directly into Critical remote compressor sites without validating ControlEdge I/O expansion?
    No. Confirm the ControlEdge I/O expansion, revision, connection scheme and ControlEdge RTU configuration before transferring SC-UCNN11 to that duty.
  • What maintenance evidence is required after SC-UCNN11 is used for Water transmission stations?
    Retain the nameplate record, corrective action, final diagnostics and a controlled water transmission stations functional-test result for SC-UCNN11.
  • How should SC-UCNN11 be returned to service in Unattended production facilities?
    Restore power under control, verify maintains remote communications, exercise the intended signal path and release SC-UCNN11 only after the ControlEdge RTU remains in its approved operating state.
Related reading

Related cases and sourcing guidance

View all case studies
Manufacturers

Product Browsing History

Revisit the products you recently viewed on Apter Power.
SPEAK TO OUR TEAM
Let’s find the right solution for you.
Send us the part number, quantity and delivery destination. Our team will help confirm availability and lead time.
  • Whatsapp: +86 18030235313

    Send us a message.
  • sales13@apterpower.com

    Complete our online form.
  • +86 18030235313

    Speak to our team in your native language.