Get Parts Quote
Name
Company *
Phone *
Email *
Address
City
State / Province / Region
Zipcode
Country
Quantity *
Part Number *
Manufacturer
Preferred Condition
Additional Information
Cancel

10002/1/2

FSC Central Processor Unit
In Stock
Ships by Monday, September 21
Fast Shipping Available

Product Describe:

Honeywell 10002/1/2 is the central processor unit for an FSC central part. It executes system operations and provides a front run/stop key switch for controlled processor operation.

Ask our team:

Get a quick price for: 10002/1/2
Quantity*
Upload (gif, jpg, jpeg, png, bmp, doc, docx, xls, xlsx, ppt, pdf, csv)
For more information on how your data is processed and stored by Apterpower please read our privacy policy.

Technical specifications for 10002/1/2

Technical specifications for 10002/1/2

  • Manufacturer:
    Honeywell
  • Product Category:
    DCS System
  • Spare Part Number:
    10002/1/2
  • Estimated shipping dimensions:
    2x18.5x12.7cm
  • Weight:
    0.18 kg
  • Tariff Code:
    8537101190
  • Counliy of origin:
    USA
  • Module type:
    CPU module
  • System family:
    Fail Safe Control
  • RAM access time:
    100 ns maximum
  • On-board jumpers:
    9
  • Hardware data-sheet version:
    2.0

Information

Information

Overview Manuals Common Applications Product Precautions
Honeywell 10002/1/2 is a fsc central processor unit for compatible Honeywell control and I/O systems.
  • System role: FSC Central Processor Unit
  • Integration focus: Compatible Honeywell host and termination hardware
  • Replacement focus: Exact assembly, revision and connector match
  • Commissioning focus: Wiring, diagnostics and functional response

Use 10002/1/2 only with the exact Honeywell host, rack or chassis, companion hardware, cable and project configuration specified for the installed system.
Confirm the complete physical label, system hardware, field connections and project documentation before installation or replacement.

Important Notice: Confirm whether the matching terminal assembly, cable, connector, power accessory, software and current Honeywell documentation are included in the quotation or stock description.

Apter Power 10002/1/2 Manuals and Guides

Important Notice: These are two separate Apter Power documents prepared from product-specific Honeywell technical information. Confirm the physical nameplate, installed-system requirements and supplied accessories before configuration or installation.

10002/1/2 installed-base maintenance
Like-for-like service of the documented FSC Central Processor Unit.
10002/1/2 compatibility review
Comparison of host hardware, companion module, revision, field wiring and configuration before replacement.
10002/1/2 installation planning
Preparation of isolation, ESD, connector, terminal and cabinet checks before field work.
10002/1/2 commissioning
Controlled verification of power, status, channels, communications, diagnostics and process response.
Read the applicable Honeywell installation instructions before work. Verify 10002/1/2 and the installed-system configuration.
1
Verify 10002/1/2 and the complete part number on the physical nameplate before installation.
2
Confirm that the installed Honeywell platform and companion hardware support the FSC Central Processor Unit function.
3
Isolate all applicable power and field energy before removing or installing 10002/1/2.
4
Use ESD controls and protect the connectors, terminals and printed-circuit assembly of 10002/1/2.
5
Record the existing wiring, jumpers, switches, firmware and configuration before replacement.
6
Do not transfer ratings, wiring or configuration from a similar Honeywell model to 10002/1/2.
7
Torque and dress field wiring to the applicable cabinet and termination instructions for 10002/1/2.
8
After installation, test power, diagnostics, channels, alarms, communication and the intended process function of 10002/1/2.

Technical notes

Technical notes

Record all nine jumper positions before replacement.

FAQS

  • How should an engineer verify nine-jumper record on 10002/1/2?
    Use the 10002/1/2 technical limit or configuration stated for nine-jumper record, then verify it at the installed channel before service.
  • What must be checked for 100 ns RAM access on 10002/1/2?
    Treat 100 ns RAM access as a product-specific commissioning point and compare the field condition with the Honeywell hardware configuration.
  • Which system detail controls central-chassis position on 10002/1/2?
    The required check concerns central-chassis position; confirm the connected hardware is the matched component listed for 10002/1/2.
  • Why is it important to confirm memory interface on 10002/1/2?
    For memory interface, isolate the circuit, record its present configuration and apply the stated Honeywell limit before re-energization.
  • Where should the team validate ESD control on 10002/1/2?
    Validate ESD control directly at the termination or module position and confirm the controller channel reports the same state.
  • What record is required for approved stopped state on 10002/1/2?
    The engineering record for 10002/1/2 should include approved stopped state, the installed wiring identity and the final functional-test result.
  • How can a configuration mismatch affect watchdog startup on 10002/1/2?
    Check watchdog startup against the selected system arrangement; a mismatch can affect channel recognition or field response.
  • What is the final commissioning test for safety-logic diagnostic sequence on 10002/1/2?
    Complete safety-logic diagnostic sequence with a controlled field stimulus and retain the result as the return-to-service baseline.
Trusted by 5,000+ plants worldwide | Backed by our vast inventory of top-tier control parts, modules and cards, fast shipments are dispatched to cover your urgent needs. ABOUT US >>
Disclaimer: We are not an authorized distributor or distributor of the product manufacturer of this website, The product may have older date codes or be an older series than that available direct from the factory or authorized dealers. Because our company is not an authorized distributor of this product, the Original Manufacturer`s warranty does not apply.While many DCS PLC products will have firmware already installed, Our company makes no representation as to whether a DSC PLC product will or will not have firmware and, if it does have firmware, whether the firmware is the revision level that you need for your application. Our company also makes no representations as to your ability or right to download or otherwise obtain firmware for the product from our company, its distributors, or any other source. Our company also makes no representations as to your right to install any such firmware on the product. Our company will not obtain or supply firmware on your behalf. It is your obligation to comply with the terms of any End-User License Agreement or similar document related to obtaining or installing firmware.

Product Browsing History

We’re Here When You Need Us

From product insights to customer service needs, our experienced service team will focus on getting you what you need quickly

Enquire

Complete our online form.

Call Us

Speak to one of our team.

Live Chat

Send us a message.