Bently
View products
GE DS200SHVMG1AED should be matched to the removed board by full marking, connector layout, installed location and system documentation before any wiring is transferred.
Important Notice: Record the complete DS200SHVMG1AED marking, board position, connectors and configuration before removal. Verify the affected system functions after installation.
The first document covers the product function, system role and technical selection. The installation guide covers identification, connection checks, commissioning and the acceptance record.