-
Match the complete marking
Include DS200FSAAG2ABA and every visible revision or serial identity in your enquiry. Keep the same complete reference on the quotation.
-
Check the offered item before ordering
Request available label and connector photos. Have your maintenance team compare the offered DS200FSAAG2ABA with the installed equipment and applicable GE documentation.
Technical specifications for DS200FSAAG2ABA
-
Manufacturer:General Electric
-
Product Category:General Automation
-
Spare Part Number:DS200FSAAG2ABA
-
Weight:0.38 kg
-
Tariff Code:8537101190
-
Board family:DC2000 FSAA field supply gate amplifier
-
Hardware group:G2: non-reversing (NRX) only
-
Bridge arrangement:Four-SCR full-wave field supply bridge
-
SCR control:P1/N1 are phase-controlled while P2/N2 turn on with positive anode voltage
-
AC MOV placement:onboard AC MOV
-
Input fuse positions:L2 and L3
-
Onboard fuse rating:30 A each
-
Protected field load:Up to 24 A via onboard fuses; larger fields need external fusing
-
Mode hardware:no G1 mode-selection jumpers
-
Board identification:Complete DS200FSAAG2ABA edge marking
-
Revision marking:ABA suffix
Information
- GE DS200FSAAG2ABA is part of the DC2000 field-supply firing path, controlling the SCR bridge that energizes the motor field in the installed drive.
Protection review: Check L2/L3 fuses and the installed field-current arrangement
Release test: Verify field excitation and drive response under a controlled start
In this G2 group, P1/N1 are phase-controlled while P2/N2 turn on with positive anode voltage. The AC surge-protection MOV is mounted on the G2 board. These are hardware-group distinctions and must remain aligned with the actual SCR bridge when a board is exchanged.
Two 30 A onboard fuses protect the L2 and L3 lines. GE's instructions distinguish field loads through 24 A from larger fields that use external fuses to feed the field; verify the installed fuse coordination and record the as-left bridge connections before enabling operation.
-
General Electric DS200
FSAAG 2ABA technical reference Apter Power technical reference - PDF, 5 pages. Field Supply Gate Amplifier identity, interfaces and engineering scope. -
General Electric DS200
FSAAG 2ABA installation guide Prepared by Apter Power - PDF, 5 pages. Preparation, installation, testing and handover for DS200FSAAG 2ABA.
Compatibility boundary: The FSAA board controls field-supply gating; a different G group or suffix is not an automatic substitute even where the base FSAA reference is shared.
-
Field bridge firing
Drive the four-SCR field-supply arrangement in the documented G2 mode; verify the firing leads and bridge terminals against the original wiring schedule. -
Motor field excitation
Coordinate field current with the DC2000 drive controls and the motor field circuit during controlled start and stop tests. -
Fuse-coordinated supply
Retain L2/L3 onboard fuse protection and establish whether the actual field rating requires external fuses for the field feed. -
Replacement and fault review
Use complete board marking, bridge hardware, MOV placement and recorded wiring to investigate field loss, fuse operation or unstable excitation.
Apply the site lockout procedure to incoming power and the field supply. Verify stored energy is discharged before touching the board or bridge.
Handle the printed board by its edges using grounded ESD protection; protect connectors and components during transport and insertion.
Read the full DS200FSAAG2ABA edge marking and the installed bridge record. A G1 and G2 FSAA board have different SCR-control and MOV arrangements.
Inspect the L2/L3 30 A fuse positions and determine whether the field circuit needs larger external fuses under the original GE instructions.
Record no G1 mode-selection jumpers. Do not transfer settings from a neighboring group or assume board appearance defines the operating mode.
After wiring verification, prove field voltage/current response, relevant drive alarms and protective operation at a safe test point before normal operation.
Alternative Names
Technical notes
Field-supply relationship: The board is mounted on a four-SCR full-wave field bridge. In the G2 circuit, P1/N1 are phase-controlled while P2/N2 turn on with positive anode voltage. Keep the original bridge, firing leads and MOV arrangement with the installed drive configuration.
Protection and handling: L2/L3 input fuses are rated 30 A. The original instructions distinguish fields up to 24 A from larger applications that require external field fusing; isolate and discharge the equipment before board handling.
Technical reference: GE Drive Systems FSAA Single-phase Field Supply Gate Amplifier Board Replacement Instructions, GEI-100186, October 1994. The G2 group behavior is documented; the complete revision marking remains an installation identity that must be matched with the drive record.
FAQ View All FAQ
-
Why must the field bridge be reviewed together with DS200FSAAG2ABA during replacement?DS200FSAAG2ABA drives SCR firing in a four-SCR full-wave motor-field bridge; the board alone is not the complete excitation circuit. Compare bridge identity, wiring, field-current arrangement and drive controls before fitting the replacement, then prove controlled excitation under the site test plan.
-
How does the G2 hardware group constrain use of DS200FSAAG2ABA?G2 is the non-reversing NRX-only group. Confirm the installed drive's field mode and bridge record before substitution; its firing pattern and onboard MOV arrangement differ from G1 hardware.
-
What bridge-firing difference must be checked before substituting DS200FSAAG2ABA?On G2, P1/N1 are phase-controlled and P2/N2 turn on with positive anode voltage. Compare that behavior with the installed four-SCR bridge and controller design; a G1 board phase-controls all four SCRs and cannot be treated as equivalent by connector appearance.
-
How should the AC surge-protection path be checked when fitting DS200FSAAG2ABA?The G2 AC MOV is on the board. Inspect its condition, the associated bridge wiring and the L2/L3 protection path before energizing; a G1 installation uses a separate MOV subassembly, so its layout should not be copied.
-
When does the field-current arrangement of DS200FSAAG2ABA require external fuse review?The board's L2/L3 onboard fuses are 30 A each. GE describes onboard protection for field loads up to 24 A; higher-current applications require external field fusing while the onboard fuses protect the MOV path. Verify the actual field load and cabinet fuse scheme against the drive drawing.
-
Can DS200FSAAG2ABA replace the other FSAA G group directly?Do not treat the G1 and G2 groups as direct substitutes. Their SCR firing behavior, MOV placement and mode hardware differ; use the drive and bridge record to evaluate any proposed change.
-
Which marking should be recorded before fitting DS200FSAAG2ABA?Record the complete DS200FSAAG2ABA edge marking, bridge identity, fuse data, connector positions and any mode hardware. Keep an as-found wiring record so the board can be returned to its original configuration.
-
How should DS200FSAAG2ABA be accepted after installation?Verify isolation is removed deliberately, check bridge connections and fuse continuity, then observe controlled field excitation and drive protection indications under a site-approved test plan.
Supporting new and legacy automation
-
Please try to be as accurate as possible with your search.
-
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
-
We can't find any results for “”.
Related cases and sourcing guidance
View all case studiesYou May Also Like
Product Browsing History
-
Whatsapp: +86 18030235313
Send us a message. -
sales13@apterpower.com
Complete our online form. -
+86 18030235313
Speak to our team in your native language.





