Bently
View products
The sensor geometry, total cable length and converter calibration operate as one measurement chain. Target material, initial gap, supply wiring and converter output must be checked together during commissioning.
Important Notice: Use PR6423/13R-040 only with the documented connector and converter arrangement; do not transfer calibration data from a different PR6423 cable or mounting code.
The Technical Reference organizes the exact ordering identity, applicable characteristics and system boundary for this eddy current system. The Installation & Commissioning Guide covers identification, pre-installation checks, connections, functional verification and the acceptance record.