Pair the 0.5 m probe lead with a compatible extension cable and the configured Proximitor total length. Restore the original gap and controlled monitor response during replacement.
Important Notice: Verify the final 05 approval option and the complete installed 8 mm chain before commissioning.
These documents serve different purposes: the first records exact probe and matched-system data; the second covers installation checks, commissioning and acceptance.