Prepare a flat, clean mounting surface and torque the M8 x 1.25 stud according to the manufacturer installation instructions. Verify connector orientation, cable restraint and channel polarity before functional acceptance.
Important Notice: Confirm quotation scope, physical marking, included accessories and installed-system compatibility before work.
Important Notice: The first document is an Apter Power model-specific technical reference; the second link is the unmodified official manufacturer publication.