Use the ADLINK CPCI-6930D reference as the starting point for a board enquiry, then check the full label against your installed unit. Include the chassis identification, board revision and photographs of the faceplate and connectors. State which accessories are needed so the quotation describes the complete purchasing requirement rather than an abbreviated board name.
Showing 1 products
Please try to be as accurate as possible with your search.
We can quote you on 1000s of specialist parts, even if they are not listed on our website.
Start with the manufacturer and full part number. Use the checks below to prepare the equipment details, supplier documents and delivery requirements for your enquiry.
COMPANY DOCUMENTS
Prepare for supplier approval
Tell us which company documents your purchasing team needs. Include your approval checklist and any required format so we can confirm what is available for review.
Check the full part number and hardware revision against your equipment. Include related components where relevant, and have your engineer review the proposed replacement.
Provide the destination, required arrival date and any receiving restrictions. Review the proposed dispatch date, shipping method and packing requirements against your schedule.
Include the manufacturer, part number and quantity for each item, plus your delivery destination and required date. Add label photos or equipment details if a reference is unclear.