Product Describe:
ABB PCU-03 is a purge controller module, part E-31978, used in the Trallfa TR-5000 control family. Its front-panel controls provide purge-time setting, reset and status indication.
ABB PCU-03 is a purge controller module, part E-31978, used in the Trallfa TR-5000 control family. Its front-panel controls provide purge-time setting, reset and status indication.
Adjustable purge timing: Uses separate 100-second, 10-second and 1-second setting dials.
Four-state indication: Shows Power, Purged, Purging and Fault status.
Local reset: Provides a front-panel reset control for the documented purge-controller role.
TR-5000 integration: Matches the control-module function used in the Trallfa TR-5000 family.
Confirm PCU-03 and E-31978 on the installed module. Record the purge-time settings and all interface connections before replacement.
Important Notice: Confirm the complete ABB PCU-03 identity and controlled configuration before commissioning.
The first document presents model-specific technical and system data. The second provides a separate installation, connection, commissioning and acceptance workflow.
Robot paint-system purge control
Controls the documented purge sequence in a compatible Trallfa installation.
Purge-time configuration
Sets the required purge interval through the three front-panel time controls.
Status monitoring
Provides local indication of power, purging, purged and fault states.
Legacy controller maintenance
Supports exact PCU-03 replacement in the documented TR-5000 arrangement.
Read the applicable ABB instructions before work. Verify ABB PCU-03 and the installed system configuration before commissioning.
1
Verify the complete ABB PCU-03 and E-31978 marking before work.
2
Record the 100-second, 10-second and 1-second dial settings.
3
Record every connector and interlock associated with the purge sequence.
4
Place the controlled process in the approved safe state before module removal.
5
Do not bypass purge or fault interlocks during replacement.
6
Use ESD controls and inspect the mating connector before installation.
7
Confirm all four status indicators operate as expected after installation.
8
Complete the approved purge-sequence and fault-response test before release.
Technical notes
Confirm PCU-03 and E-31978 on the installed module. Record the purge-time settings and all interface connections before replacement.